Laws & Regulations
-
Water Quality Standards Regulations: Georgia
Information related to Water Quality Standards for Georgia.
-
Basic Information about Scientific Coordination
Basic Information about Scientific Coordination
-
Regulatory Determination 2 Support Documents for 1,1,2,2-Tetrachloroethane
Learn about the support documents for 1,1,2,2-tetrachloroethane.
-
Regulatory Determination 2 Support Documents for 2,4-Dinitrotoluene and 2,6-Dinitrotoluene
Learn about the support documents for 2,4-dinitrotoluene and 2,6-dinitrotoluene
-
Regulatory Determination 2 Support Document - Evaluation of Health and Occurrence Data
Learn about the Support Document - Chapter 2: Evaluation of Health and occurrence Data Regulatory Determination 2
-
Regulatory Determination 1 Support Documents for Hexachlorobutadiene
Hexachlorobutadiene Support Documents
-
Regulatory Determination 1 Support Documents for Occurrence Analysis and Appendices
Occurrence Analysis Support Documents
-
PUEBLO OF TESUQUE - FINAL NPDES PERMIT NO. NM0031224
Pueblo of Tesuque, NM0031224
-
Sulfur Dioxide (SO2) Air Quality Standards - Documents from Review Completed in 2010
Sulfur Dioxide (SO2) Air Quality Standards - Documents from Review Completed in 2010
-
NPDES Permit for Potomac Electric Power Company (PEPCO) Benning Generating Station
Under National Pollutant Discharge Elimination System permit number DC0000094, the Potomac Electric Power Company (PEPCO) is authorized to discharge from the Benning Service Center to receiving waters named Anacostia River.
-
FARMINGTON ELECTRIC UTILITY SYSTEM - BLUFFVIEW POWER PLANT - FINAL NPDES PERMIT NO. NM0031135
FARMINGTON ELECTRIC UTILITY SYSTEM - BLUFFVIEW POWER PLANT - Final NPDES PERMIT NO. NM0031135
-
Getting Started with Lead Service Line Identification and Replacement
Information for water systems on how to begin planning for lead service line replacement, including links to important regulatory information.
-
Resources for Neighboring Jurisdiction Process
Provides overview of CWA Section 401(a)(2) and resources to help implement Section 401.
-
Method 5G - Particulate Matter Wood Heaters from a Dilution Tunnel
CFR Promulgated Test Method 5G PM Wood Heaters from a Dilution Tunnel (Particulate Matter)
-
Supply, Underground Injection, and Geologic Sequestration of Carbon Dioxide
The CO2 Supply and Injection sector consists of CO2 suppliers and facilities that inject CO2 underground, including data from the 2023 Data Highlights.
-
Performance Specification 4B for Carbon Monoxide and Oxygen
Performance Specification 4B - Specifications and Test Procedures For Carbon Monoxide Continuous Emission Monitoring Systems In Stationary Sources
-
Rules for Chemicals Made from Plastic Waste-Based Feedstocks under the Toxic Substances Control Act
Rules for Chemicals Made from Plastic Waste-Based Feedstocks under the Toxic Substances Control Act
-
TSCA Section 5(a)(3)(C) Determination for Premanufacture Number (PMN) P-18-0401
This document describes EPA's pre-manufacture notice review determination under amended TSCA for P-18-0401.
-
TSCA Section 5(e) Exposure-Based Policy: Testing
This page contains the basic TSCA section 5(e) exposure-based testing typically triggered by meeting human or environmental exposure criteria.
-
TSCA Section 5(a)(3)(C) Determination for Premanufacture Number (PMN) P-18-0177
This document describes EPA's pre-manufacture notice review determination under amended TSCA for P-18-0177 .