Learn the Issues
-
Facility Cleanup
This first overall 2-page fact sheet describes the facility cleanup work being conducted at the Cavenham Forest Industries, LLC.
-
Hudson School (Collegeville) Voluntary Cleanup Report, Walter Coke, Inc., Birmingham, Alabama
Hudson School (Collegeville) Voluntary Cleanup Report, Walter Coke, Inc., Birmingham, Alabama
-
Health and Safety Plan Walter Coke Residential Sampling in Birmingham, Alabama
Health and Safety Plan Walter Coke Residential Sampling in Birmingham, Alabama. June 30, 2011
-
Control And Containment Design Report
his work plan (571-pages) is called the “SWMU-3-1 and 3-4 Control and Containment Design Report” was written to be in compliance with new FEMA requirements that the design must not create any positive change in the 100 year flood elevation.
-
Site-Specific Aquatic Wildlife Screening Level Exposure Evaluation
The first report (14-pages) presents the methodology and results of the ecological risk assessment for benthic invertebrates and fish in Turkey Creek near the target facility.
-
Site-Specific Mammalian and Avian Wildlife Screening Level Exposure Evaluation
The second report (21-pages) presents the ecological risk assessment for higher level organisms (bird and mammalian receptors), using the raccoon and Great Blue Heron as indicator species.
-
Hudson School (Collegeville) Voluntary Investigation and Cleanup Report
Hudson School (Collegeville) Voluntary Investigation and Cleanup Report
-
EPA Approval Letter for Human Health Risk Assessment
The EPA approval letters for the human health risk assessment (2-pages) provides feedback to the regulated facility, Cavenham Forest Industries, that this report was acceptable.
-
EPA Approval Letter for Ecological-Related Risk
The EPA approval letters for the ecological risk assessments (2-pages) provides feedback to the regulated facility, Cavenham Forest Industries, that this report was acceptable.
-
Resource Conservation and Recovery Act (RCRA) Facility Presentation
The first presentation (86-slides), provided by Environmental Management Services (contractor to Cavenham Forest Industries) covers work progress being undertaken with respect to the corrective action.
-
Draft Hazardous Solid Waste Amendment (HSWA) Permit Renewal
The is presentation (17-slides) given by EPA’s Corrective Action Program, covers background, EPA’s perspective on the draft permit and a photography slideshow of facility conditions in 1987.
-
Cavenham 1987
This presentation (21-slides) given by EPA’s Corrective Action Program, covers background, EPA’s perspective on the draft permit and a photography slideshow of facility conditions in 1987.
-
Walter Groundwater Interim Measures Work Plan Part 2
Walter Groundwater Interim Measures Work Plan Part 2
-
Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama
Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama.
-
Grenadier Energy Partners, LLC - Jolliffe Impoundment
Grenadier Energy Partners, LLC - Jolliffe Impoundment. Knob Fork, W.Va. Aug. 30, 2012
-
Correspondence between PADEP and wastewater treatment facilities
J.J. Bucher Producing Corporation
-
Jay Bee Oil and Gas - Nurses Hollow Impoundment
Jay Bee Oil and Gas - Nurses Hollow Impoundment. Center Point, Doddridge County, W.Va. July 1, 2013
-
Jay Bee Oil and Gas - Yeater Well Pad
Jay Bee Oil and Gas - Yeater Well Pad. Center Point, Doddridge County, W.Va. Feb. 22, 2012
-
Mountain V Oil and Gas - Farnsworth Stockert Freshwater Impoundment
Mountain V Oil and Gas - Farnsworth Stockert Freshwater Impoundment. Tallmansville, Upshur Co., W.Va. Dec. 2, 2011
-
PDC Mountaineer, LLC - D'Annunzio Well Pad
PDC Mountaineer, LLC - D'Annunzio Well Pad. Nutter Fort, Harrision Co., W.Va. Feb 2, 2012