Learn the Issues
-
Environmental Financial Advisory Board (EFAB) Meeting Materials - April 20-21, 2021
Materials for EFAB meeting.
-
Environmental Financial Advisory Board (EFAB) Meeting Materials - April 17-18, 2019
Materials for EFAB meeting, April 17-18, 2019.
-
Report to Congress on Integrated Plans and Municipality Profiles
This report describes EPA’s Integrated Planning Framework which lays out a flexible process and includes overarching principles and six essential elements that integrated plans should address.
-
Coordinating Off-site Stormwater Management Requirements in Saint Paul, Minnesota
Case Study - Off-site Stormwater Management in Saint Paul, Minnesota
-
Previous Versions of EPA's Construction General Permit
Previous versions of EPA's construction general permit (CGP).
-
Combined Sewer Overflow Frequent Questions
Frequently asked questions regarding Combined Sewer Overflows (CSOs).
-
NPDES State Pretreatment Program Status Map
A map showing the approval status of states pretreatment program.
-
Pretreatment General and Specific Prohibitions Documents
Documents related to specific prohibitions of hazardous exposure to wastewater.
-
Documents, Reports and Photographs for Nova Chemicals in Monaca, Pennsylvania
RCRA Corrective Action Nova Chemical, Monaca PA, Documents and Reports
-
Artifacts and Shipwrecks in New Bedford Harbor
Learn more about artifacts and shipwrecks discovered in New Bedford Harbor.
-
Mystic River Watershed Steering Committee Meeting, Open Space Group - Conference Call, April 26, 2011
Document(s) from the April 26, 2011 Steering Committee Meeting (Open Space Group - Conference Call) for the Mystic River Watershed.
-
Mystic River Watershed Water Quality Subgroup Meeting, April 11, 2011
Document(s) from the April 11, 2011 Water Quality Subgroup Meeting for the Mystic River Watershed.
-
Mystic River Watershed Steering Committee Meeting, Open Space Group, October 4, 2010
Document(s) from the October 4, 2010 Open Space Group Meeting for the Mystic River Watershed.
-
First Mystic River Watershed Steering Committee Meeting, March 11, 2009
Document(s) from the March 11, 2009 Steering Committee Meeting for the Mystic River Watershed.
-
Mystic River Watershed Pre-Summit Meeting, January 9, 2008
Document(s) from the January 9, 2008 Pre-Steering Committee Meeting for the Mystic River Watershed.
-
Mystic River Watershed Steering Committee Meeting, September 15, 2010
Document(s) from the September 15, 2010 Steering Committee Meeting for the Mystic River Watershed.
-
Mystic River Watershed Steering Committee Meeting, July 21, 2010
Document(s) from the July 21, 2010 Steering Committee Meeting for the Mystic River Watershed.
-
Hot Work Permit Review Date
Stationary sources subject to the Program 3 Prevention Program requirements in 40 CFR Part 68, Subpart D, must include in their Risk Management Plan the date of the most recent review or revision of hot work permit procedures in Section 7.13. What date should the owner or operator enter in…
-
Naturally Occurring Hydrocarbon Mixtures Exemption
Pursuant to the risk management program regulations under 40 CFR §68.115(b)(2)(iii), regulated substances in naturally occurring hydrocarbon mixtures prior to entry into a natural gas processing plant or a petroleum refining process unit do not need to be considered when determining whether more than a threshold quantity is present at…
-
Region 6 (South Central) Indoor Air Quality
Find information about local resources relating to Indoor Air Quality and EPA Region 6.