Search Frequent Questions
Filter By:
- Butte Area/Silver Bow Creek Total results: 17
- Oil Regulations Total results: 96
- Air Emissions Inventories Total results: 33
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 37
- East Palestine, Ohio Train Derailment Total results: 149
- Emergency Planning and Community Right-to-Know Total results: 286
- Enforcement Total results: 21
- Fuel Program Total results: 648
- Great Lakes Funding Total results: 68
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Permitting Under the Clean Air Act Total results: 13
- Public Engagement Total results: 25
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 284
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 113 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
Do settlement communications, such as past “agreements in principle,” impact the implementation of the final Consent Decrees?
The parties are bound by the terms of the various final, publicly available consent decrees. These consent decrees were made available for public comment before they were finalized and entered by the Court. Past settlement communications and documents created in the course of settlement discussions have been incorporated (or not)…
- Last published:
-
How does EPA ensure that the potentially responsible parties complete their work?
All cleanup activities performed by the PRPs are subject to enforcement instruments (i.e., consent decrees or administrative orders) that provide for EPA approval of all deliverables and oversight of all work performed by the PRPs.
- Last published:
-
What is the Confidentiality Order?
The Confidentiality Order (Order) is a court order entered by the Federal District Court for the District of Montana (Court) on August 8, 2002, and amended by the Court on December 31, 2003, that applies to Superfund settlement negotiations in the Clark Fork River Basin, including the following sites: Silver…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
To whom do I report an oil discharge?
A facility should report discharges to the National Response Center (NRC) at 1-800-424-8802 or 1-202-267-2675 . The NRC is the federal government's centralized reporting center, which is staffed 24 hours per day by U.S. Coast Guard personnel. If reporting directly to NRC is not practicable, reports also can be made…
- Last published:
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
Ground water pathways related to reasonably expected to discharge
The SPCC Rule applies to facilities that could reasonably be expected to discharge into navigable waters (40 CFR §112.2(a)). Does a facility need to consider ground water pathways when determining if a discharge of oil could reasonably be expected to reach navigable waters? Owners and operators should consider whether on-site…
- Last published:
-
What is considered bulk oil storage capacity?
The revised rule recognizes that oil is sometimes stored in bulk and sometimes used operationally. A bulk storage container is any container storing oil at a facility. Bulk oil storage containers may include, but are not limited to tanks, containers, drums, and mobile or portable totes. Operational use includes oil-filled…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published: