Search Frequent Questions
Filter By:
-
Lead
Total results: 396
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 232
- Testing for Lead Total results: 19
- Air Emissions Inventories Total results: 33
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Compliance Total results: 13
- Coronavirus (COVID-19) Total results: 37
- East Palestine, Ohio Train Derailment Total results: 149
- Emergency Planning and Community Right-to-Know Total results: 287
- Enforcement Total results: 21
-
Fuel Program
Total results: 648
- Diesel Sulfur Program Total results: 6
- Reporting Total results: 11
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 1
- Gasoline Sulfur Program Total results: 16
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 430
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 64
- Renewable Fuel Standard (RFS2) Total results: 84
- Great Lakes Funding Total results: 47
- Indoor Air Quality Total results: 2
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Public Engagement Total results: 26
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 284
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 413 results
-
By our reading of the regulations, the only reporting required of the oxygenate blender who elects to comply with the oxygen standard on a per gallon basis is a yearly report due the last day of February of each year (beginning in 1996) that states the total volume of RFG produced along with the certification statement. Is our interpretation correct? Are we correct in assuming that batch numbers and individual batch data are not required as part of the report?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Your interpretation is correct. (10/31/94) This question and answer was originally posted at
- Last published:
-
What is the definition of a responsible corporate officer (RCO) who is required to certify some of the submissions involved?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.75(n), reports to EPA must be signed and certified as correct by the owner or a responsible corporate officer of the refiner, importer, or oxygenate blender. "Owner" means the person who is the principal owner of…
- Last published:
-
What if the lessor knows that there is no lead-based paint in my rental housing?
Answer: If your rental housing has been found to be free of lead-based paint by a certified inspector, the Real Estate Notification and Disclosure Rule does not apply. Question Number: 23002-33220 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Can the inspection/risk assessment period for testing a house for lead be waived?
Answer: Yes. The inspection or risk assessment period can be lengthened, shortened, or waived by mutual written consent between the purchaser and the seller. Question Number: 23002-33224 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Why do water systems add phosphate to drinking water? What are the health effects of drinking water containing phosphates?
Answer: Public water systems (PWSs) commonly add phosphates to drinking water to prevent the release of metals in drinking water. Orthophosphate is most commonly used for lead and copper control. Polyphosphates sequester iron and manganese to prevent discolored water but are not effective to control lead and copper. Blended phosphates…
- Last published:
-
Are non-transient, non-community water systems (NTNCWSs) required to monitor for lead and copper?
Answer: All community water systems (CWSs) and NTNCWSs must collect lead and copper tap samples. The frequency of the monitoring and number of samples to be collected and analyzed is based primarily on the number of people served and tap water monitoring results. For an outline of monitoring requirements (e.g…
- Last published:
-
Is there anything else I can do beyond flushing my tap or buying bottled water?
Answer: Yes, find “Important Steps You Can Take to Reduce Lead in Drinking Water” if you are concerned about lead in their drinking water. The list is not intended to be exhaustive or to imply that all actions equally reduce lead from drinking water. EPA recommends you also contact your…
- Last published:
-
My neighbors got their water tested and found lead. Is my water safe?
Answer: Lead usually gets into drinking water through contact with plumbing materials such as lead pipes or lead solder, or faucets, valves, and fixtures made of brass (brass contains some lead). Since each home has different plumbing pipes and materials, test results are likely to be different for each home…
- Last published:
-
Can one still sell lead solder under the Lead Ban?
Answer: Section 1417(a)(3) of the Safe Drinking Water Act (SDWA) prohibits the sale of solder and flux that is not lead-free unless the solder or flux bears a prominent label stating that it is illegal to use the solder or flux in the installation or repair of any plumbing providing…
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How long will it take EPA to process my application to be a lead-safe certified firm?
EPA is required to process your application to be a lead-safe certified firm within 90 days of receipt. In most instances, properly-completed firm applications are processed in about one month. Question Number: 23002-17543 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does zoning affect the target housing determination? For example, would a pre-1978 house that is zoned for commercial or office use, but used for residential purposes be considered target housing?
In determining whether a pre-1978 property is target housing, it is the actual or intended use of the property that matters, not its zoning classification. Therefore, a pre-1978 house that is used or intended to be used as a residence, even if only temporary, is target housing regardless of its…
- Last published:
-
Is lead paint testing required under the Lead Renovation, Repair and Painting (RRP) Rule?
No. A firm can either assume lead-based paint is present and follow the requirements of the RRP Rule (which requires no testing), or test and if lead-based paint is found follow the requirements of the regulation. Question Number: 23002-32338 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Will insurance premiums go up for contractors covered by the Renovation, Repair, and Painting (RRP) Rule that work in homes and child-occupied facilities with lead-based paint?
The practice of carrying insurance to cover work in older homes from potential lead poisoning damages is not new. The RRP Rule, because it sets a clear standard of care and allows contractors to demonstrate that they meet that standard by taking appropriate training and using proper work practices, could…
- Last published:
-
When testing a work area, does one lead test kit or paint chip sample suffice for any single component?
The certified renovator is only required to use one lead test kit or paint chip sample for each component, even if the surface of the component is extensive (e.g., a large wall). Question Number: 23002-23865 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published: