Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Great Lakes AOCs

Cuyahoga Gorge Dam Great Lakes Legacy Act Cleanup

On this page:

  • Events
  • Background
  • Photos

Events 

Future events will be posted here. 

Background


The U.S. Environmental Protection Agency (EPA) and several non-federal sponsors are beginning a remedial or cleanup project to remove contaminated sediments from behind the Gorge Dam on the Cuyahoga River within Cuyahoga Falls and Akron, Ohio under the Great Lakes Legacy Act. EPA estimates 865,200 cubic yards of contaminated sediment from behind the Gorge Dam will be remediated. Remediation includes removal, transportation, stabilization, and placement of dredged material to take place over the course of two construction seasons. 

The purpose of the project is to address contaminants of concern in the Gorge Dam pool sediments. The contaminants are primarily polycyclic aromatic hydrocarbons, or PAHs, polychlorinated biphenyls (PCBs), oil and grease, and various heavy metals including cadmium and lead. The removal of the contaminated sediments will reduce the risk of exposure to these substances to humans as well as fish and wildlife. This cleanup will greatly advance progress in restoring beneficial uses of the Cuyahoga River to local communities and will help lead to the ultimate removal of the Cuyahoga River Area of Concern from the list of 25 remaining U.S. Areas of Concern (AOCs) — highly degraded areas found across the Great Lakes basin.

Following completion of the sediment remediation work, the dam will be removed in a subsequent project. This will return a significant portion of the river to a free-flowing natural state for the first time in over 100 years. The Gorge Dam has been in place since 1911. 

Read EPA's news release about the project agreement

Learn more about Cuyahoga River AOC

Photos

Week of June 16, 2025
  • The image shows construction crew members using equipment to collect sediment samples.

    Sediment boring samples were drilled in the river near the former Ohio Edison power plant area to get a better understanding of how the sediment material is layered above the bedrock.

  • An excavator places stones that will create an equipment launching pad for water access.

    Due to the low height of the bridge, crews are creating a safe entrance to allow for marine equipment to be launched into the river from the North side of the Front St. Bridge.

  • : An aerial image of the former Ohio Edison power plant with equipment, trailers, and barges docked in the Cuyahoga River.

    An aerial view of the former Ohio Edison power plant, that will serve as the Dredging Laydown Area for the GLLA Cleanup Project.

  • An aerial image of the Sediment Placement Area with an excavator and mock dump truck hauling woody debris.

    Crews continue to clear and grub stumps and debris in the Sediment Placement Area. The material that is removed from the river will be stabilized and placed here.

Week of June 2, 2025
  • View of the site looking south, contractor hydroseeding the site

    View of the Sediment Placement Area looking south. The contractor is pictured seeding the site to help control erosion before the dredged sediments are placed here next year.

  • View of the site looking south, contractor is clearing the site and beginning construction of the ditches and outfalls

    View of the site looking south, contractor is clearing the site and beginning construction of the ditches and outfalls.

  • View of the site looking north, left side of the picture shows compacted fill in the upland area, right side of the picture shows ditch that was recently seeded

    View of the Sediment Placement Area looking north. The left side of the picture shows compacted fill material that contractors placed in the upland area of the site. The right side of the picture shows a ditch that was recently seeded to prevent erosion.

  • View of outfall 2 installation

    Aerial view of contractors installing outfall 2 at the Sediment Placement Area.

  • View of the site looking south, showing outfall 3 and 4 to the right of the picture

    Aerial view of the Sediment Placement Area looking south, showing outfalls 3 and 4 on the right side of the picture.

  • Downstream view of the Gorge Dam pool where former USEPA vessel, the RV Mudpuppy, samples for contaminants in sediment.

    Upstream view of the Gorge Dam pool with the Front Street bridge in the distance.

  • Downstream view of the Gorge Dam pool where former USEPA vessel, the RV Mudpuppy, samples for contaminants in sediment. (Photo Credit: Elaine Marsh, Summit Metro Parks)

    Downstream view of the Gorge Dam pool where former EPA vessel, the RV Mudpuppy, samples for contaminants in sediment. (Photo Credit: Elaine Marsh, Summit Metro Parks)

  • The crew installs spuds onto the dredging barge.

    The crew installs spuds onto the dredging barge. The spuds work as an anchor for the barge to allow for easier and more precise dredging.

  • Construction machines being operated on sediment removal on the west side of the Front Street bridge.

    Preparations begin at the Highbridge Trail parking area to allow for the safe launching of marine equipment for future sediment removal on the west side of the Front Street bridge.

  • The entrance to cleanup site with a sign that reads "Area Closed"

    The Highbridge Trail was closed to the public by Summit Metro Parks on June 4, 2025.

  • Overhead view of construction machines operating on Gorge Sediment project

    Preparations begin at the Highbridge Trail parking area to allow for the safe launching of marine equipment for future sediment removal on the west side of the Front Street bridge.

Great Lakes AOCs

  • The Great Lakes
  • Great Lakes AOCs Home
  • AOC List, Map and Contacts
  • Beneficial Use Impairments
  • Remedial Action Plans
  • Great Lakes Legacy Act
Contact Us About Great Lakes AOCs
Contact Us About Great Lakes AOCs to ask a question, provide feedback, or report a problem.
Last updated on June 24, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.