Documents on Restoring the Milwaukee Estuary AOC
Documents for Milwaukee Estuary AOC.
- Estabrook Impoundment Sediment Remediation Pre-Design Study (pdf)
- About the BEACH Act (pdf)
- Milwaukee Estuary RAP Update (pdf)
- Milwaukee Estuary RAP Stage I (pdf)
Legacy Act
- Kinnickinnic River Final Remedial Action Report (pdf) (101 MB)
- Legacy Act Project Sets Stage for Revitalized River Neighborhood (pdf) (135 K)
- Kinnickinnic River Legacy Act Dredging Project Begins (pdf) (116 K)
- Kinnickinnic River Great Lakes Legacy Act Project Gets Under Way (pdf) (117 K)
- Urban environmental equity in Milwaukee research reports
- Contaminated Sediment Removed in Lincoln Park & Milwaukee River (pdf) (319 K)
- Urban environmental equity in Milwaukee research reports
- Contaminated Sediment Removed in Lincoln Park & Milwaukee River (pdf) (319 K)
The following links exit the site