Cleanup Plans and Documents Files
Below are additional documents for the Cleanup Plans and Documents page.
- Sediment Sampling Workplan Addendum, October 2017 (pdf)
- Revised 2016 Sediment Work Plan, October 2016 (pdf)
- SOW Attachment E, Operation, Maintenance & Monitoring Scope, December 2010 (pdf)
- 2015 Supplemental Design Revisions, September 2015 (pdf)
- 2014 Final Design Report (FDR), June 2014 (pdf)
- 2014 Reach 7 Final Design Report (FDR), June 2014 (pdf)
- 2015 Remedial Action Work Plan (RAWP), June 2015 (pdf)
- Appendix A of the 2015 RAWP (pdf)
- Appendix B of the 2015 RAWP (pdf)
- Appendix D of the 2015 RAWP (pdf)
- Appendix E of the 2015 RAWP (pdf)
- Appendix F of the 2015 RAWP (pdf)
- 2015 Remedial Action Work Plan (RAWP) for CU60, June 2015 (pdf)
- 2014 Remedial Action Work Plan (RAWP), July 2014 (pdf)
- Appendix A of the 2014 RAWP (pdf)
- Appendix B of the 2014 RAWP (pdf)
- Appendix C of the 2014 RAWP (pdf)
- Appendix D of the 2014 RAWP (pdf)
- Appendix E of the 2014 RAWP (pdf)
- Appendix F of the 2014 RAWP (pdf)
- 2014 Remedial Action Work Plan (RAWP) for Reach 7 – Landlocked Area, June 2014 (pdf)
- Appendix A of the 2014 RAWP for Reach 7 (pdf)
- Appendix B of the 2014 RAWP for Reach 7 (pdf)
- Treatability Studies Work Plan Text and Tables (February 2004) (pdf)
- Treatability Studies Work Plan Figures (February 2004) (pdf)
- Treatability Studies Work Plan Appendices (February 2004) (pdf)
- Quality Assurance Project Plan (QAPP) For the Hudson River PCBs Site: Design Support Sediment Sampling and Analysis Program, October 2002, Revision 4 (pdf)
- Design Support Sediment Sampling and Analysis Program Field Sampling Plan for Year 1, July 2002 (pdf)
- Phase 1 Remedial Action Community Health and Safety Plan, Rev. 3, May 2009 (pdf)
- Phase 2 Engineering Performance Standards, December 2010 (pdf)