Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Lead

Does the Renovation, Repair, and Painting (RRP) Rule prohibit the deconstruction and reuse of old building materials containing lead-based paint?

Answer:  No. The RRP Rule does not prohibit a firm from extracting, salvaging or reusing building materials that contain lead-based paint. However, the requirements of the RRP Rule may apply to these activities if they (1) occur in target housing or a child-occupied facility, and (2) disturb more than six square feet of interior painted surface or more than twenty square feet of exterior painted surface. Further, the RRP Rule only applies to renovations – the modification of an existing structure that results in the disturbance of painted surfaces. Demolition of an entire property is not a renovation for RRP purposes. Therefore, if deconstruction or salvage activities occur in conjunction with total demolition of the property, the RRP Rule would not apply. Conversely, if only a portion of the property is deconstructed, and the above two criteria are met, then the activity is a renovation and the requirements of RRP Rule apply. In such a case, firms must establish containment before deconstruction, and ensure that components to be reused are free of any lead-based paint dust or debris before they are removed from the work area.

Question Number: 23002-19962

Find a printable PDF copy of all frequent questions pertaining to lead.

Lead

  • Learn About Lead
  • Protect Your Family
  • Renovation, Repair and Painting Program
  • Evaluating & Addressing Lead-Based Paint Hazards
  • Real Estate Disclosure
  • Lead Laws and Regulations
  • En español: Plomo
Contact Us about Lead
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on November 20, 2024
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.