Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Neponset River

Cleanup Activities for Lower Neponset River, Boston/Milton, MA

Sign up for this Superfund site's mailing list.

On this page:
  • Background
  • What Has Been Done to Clean Up the Site?
  • What Is the Current Site Status?
  • Sampling and Monitoring
On related pages:
  • Operable Units
  • Cleanup Progress

Background

The Lower Neponset River site consists of a 3.7-mile section of the Neponset River between its confluence with Mother Brook (in Hyde Park, Massachusetts (MA)) and the Walter Baker Dam (in Dorchester/Milton, MA). Based on preliminary studies, this portion of the river contains sediment contaminated with elevated levels of polychlorinated biphenyls (PCBs). The Lower Neponset River channel ranges from approximately 40 feet to 300 feet wide and comprises an estimated 40 acres within or bordering the City of Boston (Hyde Park, Mattapan and Dorchester sections) and the Town of Milton, MA. The site is bordered by residential, commercial, industrial, and public parcels of land, including the Neponset River Greenway.

From 2002 through 2006, the United States Geological Survey (USGS), in cooperation with the Massachusetts Executive Office of Environmental Affairs Riverways Program and the EPA, conducted studies which included the Lower Neponset River in Boston and Milton. According to the USGS report, the PCB concentrations substantially increased in sediment core samples collected downstream of the Mother Brook confluence. In 2006 and 2007, Massachusetts Department of Environmental Protection (MassDEP) oversaw a large removal of contaminated sediments in Mother Brook, which feeds into the Neponset River. In 2013, MassDEP conducted sediment core sampling to further evaluate PCBs in Neponset River sediments at four areas along the Neponset River.

In October 2015, MassDEP requested that the EPA evaluate the Neponset River for potential listing on the National Priorities List (NPL) as the surface water, sediment, and fish within the Neponset River and Estuary are contaminated with PCBs. On March 16, 2022, the Environmental Protection Agency (EPA) listed the Lower Neponset River site on the National Priorities List.


What Has Been Done to Clean Up the Site?

A Preliminary Assessment (pdf) (5.9 MB) was completed on August 13, 2018.
The Site Inspection (pdf) (25 MB) was completed on April 19, 2019.

The Site was listed on the National Priorities List on March 16, 2022.

The remedial investigation began in February 2023.

The Remedial Investigation and Feasibility Study Phase I sampling (from the confluence of the Mother Brook and the Neponset River downstream to the Tileston and Hollingsworth Dam) was completed in November of 2023.

For updates on the progress at the Lewis Chemical removal site, please refer to https://response.epa.gov/lewischemical

For updates on the progress at the Riverside Square PCBs removal investigation site, please refer to https://response.epa.gov/riversidesquarepcb


What Is the Current Site Status?

An Engineering Evaluation and Cost Analysis to evaluate early action alternatives is in progress and is anticipated to be completed in the coming months. A public comment period will follow shortly thereafter.

The Remedial Investigation Phase 2 Reach sampling (from the Tileston and Hollingsworth Dam downstream to the Walter Baker Chocolate Dam) is ongoing and anticipated to be completed in 2025.


Sampling and Monitoring

General Remedial Investigation Phase 1 and Phase 2 sampling activities include, but are not limited to, site reconnaissance, well and outfall inventory, historical and cultural resource surveys, geospatial data collection, magnetometer surveys, installation of transducers, sediment profile imaging, ecological characterization and evaluations, and the sampling of floodplain soils, wetlands, sediment, surface water, porewater, mussels and fish tissue.

Neponset River

  • Cleanup Activities
    • Operable Units
    • Cleanup Progress
  • Health & Environment
  • Stay Updated, Get Involved
  • Redevelopment
  • Site Documents & Data
Contact Us About Neponset River
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on April 3, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.