EPA Approved State Source-Specific Requirements in the Washington SIP
Name of Source | Order/Permit Number | State Effective Date | EPA Approval Date | Explanations | |
---|---|---|---|---|---|
Boise Cascade, Wallula Mill | 9/15/04 | 5/2/05 70 FR 22597 (PDF) |
Following conditions only: No. 1 (Approval Conditions) & Appendix A. | ||
Emission Limits for Significant Stack Sources | Various orders (PDF) | various dates | 10/26/95 60 FR 54812 (PDF) |
||
Holnam, Inc., Ideal Division (now known as Lafarge North America, Inc.) | Order #5183 (PDF) | 2/9/94 | 8/31/04 69 FR 53007 (PDF) |
||
Saint Gobain Containers LLC | Order #8244 (PDF) | 9/9/99 | 8/31/04 69 FR 53007 (PDF) |
||
Kaiser Order - Alternate Opacity Limit | Order 91-01 (PDF) | 12/12/91 | 1/27/97 62 FR 3800 (PDF) |
||
Kaiser Order - Limiting Potential-to-Emit | Order 96-03 (PDF) | 10/4/00 | 7/1/05 70 FR 38029 (PDF) |
||
Kaiser Order - Limiting Potential-to-Emit | Order 96-04 (PDF) | 4/24/96 | 1/27/97 62 FR 3800 (PDF) |
||
Kaiser Order - Limiting Potential-to-Emit | Order 96-05 (PDF) | 10/4/00 | 7/1/05 70 FR 38029 (PDF) |
||
Kaiser Order - Limiting Potential-to-Emit | Order 96-06 (PDF) | 10/19/00 | 7/1/05 70 FR 38029 (PDF) |
||
RACT Limits for Centralia Power Plant | Order #97-2057R1 (PDF) | 2/26/98 | 6/11/03 68 FR 34821 (PDF) |
||
BP Cherry Point Refinery | Administrative Order No. 7836, Revision 2 (PDF) | 5/13/15 | 2/16/16 81 FR 7710 (PDF) |
The following conditions: 1.1, 1.1.1, 1.2, 1.2.1, 1.2.2, 2.1, 2.1.1, 2.1.2, 2.1.3, 2.1.4, 2.1.5, 2.2, 2.2.1, 2.2.2, 2.3, 2.3.1, 2.3.2, 2.4, 2.4.1, 2.4.2, 2.4.2.1, 2.5, 2.5.1, 2.5.1.1, 2.5.1.2, 2.5.2, 2.5.3, 2.5.4, 2.6, 2.6.1, 2.6.2, 2.6.3, 2.7, 2.7.1, 2.7.2, 2.7.3, 2.7.4, 2.8, 2.8.1, 2.8.2, 2.8.3, 2.8.4, 2.8.5, 2.8.6, 3, 3.1, 3.1.1, 3.1.2, 3.2, 3.2.1, 3.2.2, 3.2.3, 3.2.4, 4, 4.1, 4.1.1, 4.1.1.1, 4.1.1.2, 4.1.1.3, 4.1.1.4, 5, 5.1, 5.2, 6, 6.1, 6.2, 6.3, 7, 9. | |
Alcoa Intalco Works | Administrative Order No. 7837, Revision 1 (PDF) | 11/15/10 | 6/11/14 79 FR 33438 (PDF) |
The following conditions: 1, 2, 2.1, 3, 4, 4.1, Attachment A conditions: A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12, A13, A14. | |
Tesoro Refining and Marketing Company | Administrative Order 7838 (PDF) | 7/7/10 | 6/11/14 79 FR 33438 (PDF) |
The following conditions: 1, 1.1, 1.1.1, 1.1.2, 1.2, 1.3, 1.4, 1.5, 1.5.1, 1.5.1.1, 1.5.1.2, 1.5.1.3, 1.5.2, 1.5.3, 1.5.4, 1.5.5, 1.5.6, 2, 2.1, 2.1.1, 2.1.1.1, 2.1.2, 2.1.3, 2.2, 2.2.1, 3, 3.1, 3.1.1, 3.1.2, 3.1.2.1, 3.1.2.2, 3.1.2.3, 3.2, 3.2.1, 3.2.1.1, 3.2.1.2, 3.2.1.3, 3.2.1.4, 3.2.1.4.1, 3.2.1.4.2, 3.2.1.4.3, 3.2.1.4.4, 3.2.1.4.5, 3.3, 3.3.1, 3.4, 3.4.1, 3.4.2, 4, 4.1, 5, 5.1, 6, 6.1, 6.1.1, 6.1.2, 6.1.3, 6.1.4, 7, 7.1, 7.1.1, 7.1.2, 7.1.3, 7.1.4, 7.1.5, 7.2, 7.2.1, 7.2.2, 7.2.3, 7.2.4, 8, 8.1, 8.1.1, 8.1.2, 8.2, 8.2.1, 8.2.2, 8.2.3, 8.3, 8.3.1, 8.3.2, 9, 9.1, 9.1.1, 9.1.2, 9.2, 9.2.1, 9.3, 9.3.1, 9.3.2, 9.3.3, 9.4, 9.4.1, 9.4.2, 9.4.3, 9.4.5, 9.4.6, 9.5, 10, 11, 12, 13, 13.1, 13.2, 13.3, 13.4, 13.5, 13.6. | |
Port Townsend Paper Corporation | Administrative Order No. 7839, Revision 1 (PDF) | 10/20/10 | 6/11/14 79 FR 33438 (PDF) |
The following Conditions: 1, 1.1, 1.2, 1.3, 2, 2.1, 3, 3.1, 4. | |
Lafarge North America, Inc. Seattle, WA | Administrative Revised Order No. 7841 (PDF) | 7/28/10 | 6/11/14 79 FR 33438 (PDF) |
The following Conditions: 1, 1.1, 1.2, 2, 2.1, 2.1.1, 2.1.2, 2.2, 2.3, 3, 3.1, 3.1.1, 3.1.2, 3.1.3, 3.2, 3.3, 4, 4.1, 5, 5.1, 5.1.1, 5.1.2, 5.2, 5.3, 6, 6.1, 7, 7.1, 7.2, 7.3, 7.4, 7.5, 8, 8.1, 8.2, 8.3, 8.4, 8.5, 9, 10, 11, 12. | |
Weyerhaeuser Corporation, Longview, WA | Administrative Order No. 7840 (PDF) | 7/7/10 | 6/11/14 79 FR 33438 (PDF) |
The following Conditions: 1, 1.1, 1.1.1, 1.1.2, 1.1.3, 1.2, 1.2.1, 1.2.2, 1.2.3, 1.3, 1.3.1, 1.4, 2, 2.1, 3, 3.1, 4, 4.1. | |
Tyson Fresh Meats, Inc. | Approval Order 13AQ-E526 (PDF) | 4/16/14 | 5/1/20 85 FR 25303 (PDF) |
Except: References to ‘‘WAC 173–460–040’’ in Determinations’’; The portion of Approval Condition 2.a which states, ‘‘and consumption of no more than 128 million cubic feet/of natural gas per year. Natural gas consumption records for the dryer shall be maintained for the most recent 24 month period and be available to Ecology for inspection. Approval Condition 3; Approval Condition 4; Approval Condition 5; Approval Condition 6.e; Approval Condition 9.a.ii; Approval Condition 9.a.iv; Approval Condition 9.a.v; Approval Condition 9.a.vi; Approval Condition 10.a.ii; Approval Condition 10.b; Approval Condition 11.a; Approval Condition 11.b; Approval Condition 11.e; Approval Condition 12; Approval Condition 15; The section titled ‘‘Your Right to Appeal’’; and The section titled ‘‘Address and Location Information.’’ |
|
Packaging Corporation of America (Wallula Mill) | Air Operating Permit 0003697 (PDF) | 4/1/18 | 5/1/20 85 FR 25303 (PDF) |
Condition P.1 only. | |
Simplot Feeders Limited Partnership | Fugitive Dust Control Plan (PDF) | 3/1/18 | 5/1/20 85 FR 25303 (PDF) |
||
TransAlta Centralia BART - Second Revision | Administrative Order #6426 (PDF) | 7/29/20 | 5/7/21 86 FR 24502 (PDF) |
Except the undesignated introductory text, the section titled “Findings,” and the undesignated text following condition 9. |
1 The EPA does not have the authority to remove these source-specific requirements in the absence of a demonstration that their removal would not interfere with attainment or maintenance of the NAAQS, violate any prevention of significant deterioration increment or result in visibility impairment. Washington Department of Ecology may request removal by submitting such a demonstration to the EPA as a SIP revision.