NPDES General Permit for Federal Aquaculture Facilities and Aquaculture Facilities Located in Indian Country in Washington
Current permit
Below is EPA's National Pollutant Discharge Elimination System (NPDES) general permit for federal aquaculture facilities and aquaculture facilities located in Indian Country within the boundaries of Washington.
Permit number: WAG130000
Effective date: March 1, 2024
Permit expires: February 28, 2029
- NPDES General Permit, Federal Aquaculture Facilities and Aquaculture Facilities Located in Indian Country Within the Boundaries of the State of Washington, #WAG130000 (pdf)
- Appendix D.2: Quality Assurance Plan Template (docx)
- Appendix E.2: Best Management Practices Plan Template (docx)
- 2023 NPDES Permit Fact Sheet Addendum, #WAG130000 (pdf) (pdf)
- 2022 NPDES Permit Fact Sheet, #WAG130000 (pdf)
- Response to Comments on Draft NPDES Permit #WAG130000 (pdf)
- Biological Evaluation, NPDES General Permit #WAG130000 (pdf)
- Water Sampling and Testing for Formaldehyde at Northwest Fish Hatcheries (pdf)
Proposed permit modification
EPA is proposing to modify this permit. A public notice requesting comments on the proposed permit modification will be published in the Federal Register on August 14. Comments are due September 28. Copies of the draft general permit modification and supporting documents are available below.
- Draft NPDES General Permit Modification, Federal Aquaculture Facilities and Aquaculture Facilities Located in Indian Country in Washington, #WAG130000 (pdf)
- NPDES Permit Fact Sheet Addendum, Federal Aquaculture Facilities and Aquaculture Facilities Located in Indian Country in Washington, #WAG130000 (pdf)