Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. New Source Review (NSR) Permitting

General Motors Powertrain Engineering Corp. - Permitting Information

1. Facility Information

General Motors Powertrain Engineering Corp.

2. Location

895 Joslyn Avenue, Pontiac, MI

3. Distance from US/Canada Border

about 40 km

4. Facility Type and Size

proposed installation of a new engine testing facility at the existing Powertrain Pontiac facility

5. Sources of Emissions

128 engine test cells

6. Type of Fuel

diesel, gasoline, methanol, ethanol, natural gas, and/or hydrogen

7. Type and Quantity of Emissions

BACT limits: NOx 425.6TPY, and CO 285.1 TPY

8. Emission Control Technology

six natural-gas regenerative thermal oxidizers

9. Date Permit Application Received

February 5, 2004

10. Stack Height and Diameter

The stacks' minimum heights above ground level and maximum diameters are in concordance with 40 CFR 52.21 Subparts (c) and (d) (maximum diameter is 42.9 in and minimum height 40 ft for each stack)

11. Permit Agency Contact

Jim Donaldson
Michigan Department of Environmental Quality,
Air Quality Division,
Hollister Building,
106 West Allegan Street
PO Box 30260
Lansing, MI, 48909 - 7760
Tel. 517 241- 7470

New Source Review (NSR) Permitting

  • Learn About NSR
  • Regulatory Actions
  • Guidance
  • Participate
  • GHG Permitting
  • Related Links
Contact Us About the New Source Review (NSR) Permitting
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on November 5, 2024
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.