Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. NPDES Permits Around the Nation

Notice of Preliminary Designation of Certain Stormwater Discharges in the Commonwealth of Massachusetts and Notice of Availability of Draft Permit Under the National Pollutant Discharge Elimination System of the Clean Water Act

THE PUBLIC COMMENT PERIOD FOR BOTH OF THESE PROPOSED ACTIONS IS CLOSED AS OF 11:59 PM MARCH 17, 2025.

The original public comment period ran from October 31, 2024 to January 29, 2025. In response to stakeholder requests, the public comment period end date was extended by 45 days from January 29, 2025 to March 17, 2025.

Public comment submissions can be viewed at https://www.regulations.gov/docket/EPA-R01-OW-2024-0492/comments

During the comment period, EPA hosted an informational public meeting on January 7, 2025 and a public hearing on January 22, 2025.

The public meeting presentation was recorded and slides and recording are available:

  • Presentation Slides (pdf) (3.48 MB)
  • Recording

Relevant preliminary designation and draft permit documents include:

  • Preliminary Determination (pdf) (7.03 MB)
  • Draft Permit (pdf) (577.34 KB)
  • Appendix A - Definitions, Abbreviations, and Acronyms (pdf) (146 KB)
  • Appendix B - Standard Permit Conditions Applicable to All Authorized Discharges (pdf) (172.62 KB)
  • Appendix C - Endangered Species Act (pdf) (555.68 KB)
  • Appendix D - National Historic Preservation Act Eligibility Guidance (pdf) (209.38 KB)
  • Appendix E - Determining Impervious Cover Acreage (pdf) (205.35 KB)
  • Appendix F - Phosphorus Reduction Credits for Selected Non-Structural and Structural Stormwater Control Measures ("SCMs") (pdf) (1.84 MB)
  • Appendix G - Notices of Intent ("NOI"), Change ("CNOI"), and Termination ("NOT") (pdf) (214.21 KB)
  • Appendix H - Massachusetts Tax Assessor’s Use Code for CII Land Uses (pdf) (232.44 KB)
  • Appendix I - Operations and Maintenance Requirements (pdf) (175.86 KB)
  • Appendix J - Methodology for Determining Site-Specific Pollutant Calculation (pdf) (303.23 KB)
  • Appendix K - Reporting Requirements for Annual Reports (pdf) (99.67 KB)
  • Fact Sheet (pdf) (828.22 KB)

Other relevant information:

  • Residual Designation in the Charles River Watershed, Mystic River Watershed and Neponset River Watersheds website
  • Federal Register
  • Federal eRulemaking Docket
  • Public Comments
  • Administrative Record Preliminary Designation
  • Administrative Record Draft Permit
  • EPA's December 2024 Informational Postcard mailed to Potential Permittees (pdf) (90.16 KB)
  • January 7th 2025 - Public Meeting Presentation Slides (pdf) (3.48 MB)
  • January 7th 2025 Public Meeting Recording

For questions contact:
Laura Schifman
US Environmental Protection Agency – Region 1
5 Post Office Square, Suite 100 (WIP06-1)
Boston, MA 02109
Telephone: (617) 918-1015
Email: R1.RDA@epa.gov

Contact Us to ask a question, provide feedback, or report a problem.
Last updated on April 16, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.