DTE Electric Co. Belle River Power Plant
1. Facility Information
DTE Electric Co. Belle River Power Plant (MI) LLC
2. Location
4505 King Road, China Township, St. Clair County, MI
3. Distance from US/Canada Border
about 1.6 km
4. Facility Type and Size
Conversion of coal fired power plant to natural gas fired peaking power plant.
5. Sources of Emissions
natural gas combustion
6. Type of Fuel
natural gas
7. Type and Quantity of Emissions
CO 3,702 tpy
PM10 186 tpy
PM2.5 186 tpy
NOx 2,463 tpy
VOC 135 tpy
SO2 24 tpy
CO2e 2,993,839 tpy
lead 0.01 tpy
Only major modification for CO.
8. Emission Control Technology
catalytic oxidation for CO
9. Date Permit Application Received
EPA received application 11/12/24.
10. Permit Agency Contact
Cindy Smith
Permit Section Manager
Air Quality Division
Michigan Department of Environment, Great Lakes, and Energy
517-284-6803 | SMITHC17@michigan.gov