Learn the Issues
-
Minard Run Oil Company
Minard Run Oil Company.
-
Mystic River Watershed Municipal Subcommittee Meeting, November 25, 2014
Document(s) from the November 25, 2014 Municipal Subcommittee Meeting for the Mystic River Watershed.
-
Borough of Ridgway
Borough of Ridgway. NPDES Permit No. PA0023213
-
Reynoldsville Sewer Authority
Reynoldsville Sewer Authority. NPDES Permit No. PA0028207. July 13, 2011
-
Mystic River Watershed Municipal Subcommittee Meeting, January 14, 2010
Document(s) from the January 14, 2010 Municipal Subcommittee Meeting for the Mystic River Watershed.
-
Franklin Township Sewer Authority
Franklin Township Sewer Authority. NPDES Permit No. PA0046426
-
Columbia Gas Transmission, LLC - Blake Fork, Middle Fork Lynn Camp Run, and Lynn Camp Run
Columbia Gas Transmission, LLC - Blake Fork, Middle Fork Lynn Camp Run, and Lynn Camp Run. Wetzel Co., W.Va. March 31, 2011
-
Chesapeake Appalachia, LLC - Villers. Villers Property, Marshall Co., W.Va. Jan. 26, 2011
Chesapeake Appalachia, LLC - Villers. Villers Property, Marshall Co., W.Va. Jan. 26, 2011
-
Mystic River Watershed Water Quality Subcommittee Meeting, March 3, 2016
Document(s) from the March 3, 2016 Water Quality Subcommittee Meeting for the Mystic River Watershed.
-
Hudson School (Collegeville) Voluntary Cleanup Report, Walter Coke, Inc., Birmingham, Alabama
Hudson School (Collegeville) Voluntary Cleanup Report, Walter Coke, Inc., Birmingham, Alabama
-
Hudson School (Collegeville) Voluntary Investigation and Cleanup Report
Hudson School (Collegeville) Voluntary Investigation and Cleanup Report
-
Health and Safety Plan Walter Coke Residential Sampling in Birmingham, Alabama
Health and Safety Plan Walter Coke Residential Sampling in Birmingham, Alabama. June 30, 2011
-
EPA Approval of Community Involvement Plan. Jan 25, 2013
EPA Approval of Community Involvement Plan. Jan 25, 2013.
-
Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama
Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama.
-
Site Specific Health and Safety Plan
Site Specific Health and Safety Plan. October 9, 2012. Walter Coke. Birmingham, Alabama.
-
Final Community Involvement Plan (Revision 1.0)
Final Community Involvement Plan (Revision 1.0)
-
EPA Approval of Risk Assessment Work Plan, Region 1.1
EPA Approval of Risk Assessment Work Plan, Region 1.1.
-
Final Vapor Intrusion Characterization Work Plan (Revision 1.0) Part 1
Final Vapor Intrusion Characterization Work Plan (Revision 1.0) Part 1
-
Mineral Wool Piles - Sample Analysis Report. Revision 5.
Mineral Wool Piles - Sample Analysis Report. Revision 5. Sample Collection and Analysis at the Walter Coke Facility.
-
Final Risk Assessment Work Plan (Revision 1.1)
Final Risk Assessment Work Plan (Revision 1.1)