Learn the Issues
-
If my Tribe was a partner on a prior EN grant award, am I unable to apply for the ‘individual capacity building with mentorship’ project opportunity in Appendix C?
If your Tribe has received a prior EN grant, even as part of a formal EN partnership application, this would count as having received a prior EN grant and you would not be eligible for the ‘Individual Capacity Building with Mentorship’ EN project opportunity in a future cycle. However, there…
-
Can my Tribe purchase a vehicle under this grant program, for use when driving to remote monitoring locations across our lands? If that is unallowable, could I instead include regular vehicle rentals for this purpose?
The purchase of a vehicle is technically an allowable purchase under the EN Grant Program, but with a few important considerations: A vehicle is defined as “general purpose equipment” under 2 CFR 200.1, specifically: “equipment that is not limited to research, medical, scientific, or other technical activities. Examples include…
-
Approved Air Quality Implementation Plans in Region 3
Read about the approved State Implementation Plans, Tribal Implementation Plans, as well as any Federal Implementation Plans for Region 3.
-
Vulnerability Assessment Checklist (PDF)
Vulnerability Assessment Checklist from the Appendix of the Climate Change Handbook for Regional Water Planning
-
Advanced Refrigeration Technologies
Describes a centralized DX system as well as an overview of the different advanced refrigeration options.
-
2025 SO2 Allowance Auction
Find on this page the results of EPA's 2024 Acid Rain Program sulfur dioxide (SO2) allowance auction, which took place on March 26, 2024.
-
Ridgway Borough
Ridgway Borough. General Analysis Report.
-
Report of the Chief FOIA Officer to the U.S. Department of Justice, 2019
2019 Chief FOIA Officer Report (March 2018 - March 2019)
-
April 1997 Final Report Volume 2: Appendices - Ecological Assessment Ecological Risk Evaluation of the Salt Marsh and Adjacent Areas at the LCP Superfund Site, Brunswick, GA
This Appendix to the ecological evaluation of the Brunswick, GA salt marsh covers Life Histories for Receptor Species.
-
Borough of Ridgway
Borough of Ridgway. NPDES Permit No. PA0023213. July 13, 2011
-
Correspondence between PADEP and wastewater treatment facilities
Clearfield Muncipal Authority
-
Allegheny Valley Joint Sewage Authority
Allegheny Valley Joint Sewage Authority. NPDES Permit No. PA0026255. July 13, 2011
-
Brockway Area Sewer Authority
Brockway Area Sewer Authority. NPDES Permit No. PA0028428. July 13, 2011
-
TerrAqua Resource Management
TerrAqua Resource Management. Harrisburg, PA. Sept. 21, 2009
-
Dominion Transmission, Inc.
Dominion Transmission, Inc. Monitoring Data. January 2012
-
Minard Run Oil Company
Minard Run Oil Company. Chemical Analysis Report.
-
April 1997 Final Report - Ecological Assessment Ecological Risk Evaluation of the Salt Marsh and Adjacent Areas at the LCP Superfund Site, Brunswick, GA
Final report evaluating the Purvis Creek salt marsh area in Brunswick, GA.
-
January 1998 Volume I Ecological Risk Assessment of the Marsh Area of the LCP Chemical Site in Brunswick, Georgia
This ecological risk assessment (ERA) addresses the marsh area of the Linden Chemicals and Plastics Site (LCP Site) in Brunswick, Georgia.
-
Clairton Municipal Authority
Clairton Municipal Authority. NPDES Permit No. PA0026824. July 13, 2011
-
Minard Run Oil Company
Minard Run Oil Company. Chemical Analysis Report.