Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 33
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Compliance Total results: 13
- Coronavirus (COVID-19) Total results: 37
- East Palestine, Ohio Train Derailment Total results: 149
- Emergency Planning and Community Right-to-Know Total results: 287
- Enforcement Total results: 21
-
Fuel Program
Total results: 648
- Diesel Sulfur Program Total results: 6
- Reporting Total results: 11
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 1
- Gasoline Sulfur Program Total results: 16
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 430
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 64
- Renewable Fuel Standard (RFS2) Total results: 84
- Great Lakes Funding Total results: 47
- Indoor Air Quality Total results: 2
-
Lead
Total results: 396
-
Lead Renovation, Repair and Painting
Total results: 232
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 1
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 17
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Testing for Lead Total results: 19
-
Lead Renovation, Repair and Painting
Total results: 232
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Public Engagement Total results: 26
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 284
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 249 results
-
By our reading of the regulations, the only reporting required of the oxygenate blender who elects to comply with the oxygen standard on a per gallon basis is a yearly report due the last day of February of each year (beginning in 1996) that states the total volume of RFG produced along with the certification statement. Is our interpretation correct? Are we correct in assuming that batch numbers and individual batch data are not required as part of the report?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Your interpretation is correct. (10/31/94) This question and answer was originally posted at
- Last published:
-
What is the definition of a responsible corporate officer (RCO) who is required to certify some of the submissions involved?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.75(n), reports to EPA must be signed and certified as correct by the owner or a responsible corporate officer of the refiner, importer, or oxygenate blender. "Owner" means the person who is the principal owner of…
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How long will it take EPA to process my application to be a lead-safe certified firm?
EPA is required to process your application to be a lead-safe certified firm within 90 days of receipt. In most instances, properly-completed firm applications are processed in about one month. Question Number: 23002-17543 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does zoning affect the target housing determination? For example, would a pre-1978 house that is zoned for commercial or office use, but used for residential purposes be considered target housing?
In determining whether a pre-1978 property is target housing, it is the actual or intended use of the property that matters, not its zoning classification. Therefore, a pre-1978 house that is used or intended to be used as a residence, even if only temporary, is target housing regardless of its…
- Last published:
-
Will insurance premiums go up for contractors covered by the Renovation, Repair, and Painting (RRP) Rule that work in homes and child-occupied facilities with lead-based paint?
The practice of carrying insurance to cover work in older homes from potential lead poisoning damages is not new. The RRP Rule, because it sets a clear standard of care and allows contractors to demonstrate that they meet that standard by taking appropriate training and using proper work practices, could…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
Question 14, Section VI.C., of the July 1, 1994 Question and Answer Document provides an example of the creation and addition of two different batches to form a composite mixture. All or a portion of this composite is shipped as RFG. How will the refinery account for this shipment under recordkeeping and averaging requirements (assuming the refinery is averaging), based on the scenario outlined in Question 14?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Question 14 relates to in-line blending operations that have petitioned EPA for and received an exemption from the independent sampling and testing requirements of the RFG regulations. In such petitions, refiners often define a "batch" of in-line blended…
- Last published:
-
If a certified renovator is an employee of the certified firm, can the firm maintain all required records (those required of the firm and of the certified renovator); understanding that the certified renovator must also keep a copy of his certification as well as employee training records/documentation on the jobsite?
Answer: The renovation firm is the entity responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for a period of three years following completion of the renovation. The certified renovator is responsible for preparing the records demonstrating that the renovation was…
- Last published:
-
If a door is outside the work area but used by workers to enter and exit the room, does the door need to be covered with plastic?
If the work area is smaller than the entire room, and the door is not within the work area, you do not need to cover the door with plastic. However, all personnel, tools, and other items, including the exterior of containers of waste, must be free of dust and debris…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If a remodeling company that is a certified firm uses all contractual workers rather than employees, must each contractual worker be a certified renovator, or can the workers be trained on the job by a certified renovator employed by the firm?
Firms hiring contractual workers may provide the certified renovator that oversees the renovation project and provides on-the-job training to contractual workers and other non-certified workers. Question Number: 23002-18377 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
What training requirements apply to non-certified workers who have previous EPA/HUD lead-safe work practices training or accredited abatement supervisor or worker training?
The Lead Renovation, Repair, and Painting (RRP) Rule requires certified renovators to provide on-the-job training (OJT) to non-certified workers on the work practices they will be using in performing their assigned tasks. The amount of OJT needed and the topics that need to be covered depend on the knowledge and…
- Last published:
-
What is the definition of a child under 6 years of age?
Answer: A child under six years of age is a child that is less than 72 months old. Question Number: 23002-22691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published: