Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. East Palestine, Ohio Train Derailment

Newsletter: East Palestine Train Derailment Response, 5-16-2023

Newsletter serving Serving East Palestine, Negley, Darlington, and surrounding communities

On this page:
  • Progress Made
  • The Week Ahead
  • Community Corner
  • Did You Know?
  • Site Status Check
  • Top 3 Questions of the Week
  • In Case You Missed It
  • Safety Minute
  • Key Community Events This Week
  • Community Resource List

  •  

Progress Made

North Track Excavation Reaches the Halfway Point

Crews are making cleanup progress along the north track, removing the ballast, or railbed, all the way down to the ground layer. Next, heavily contaminated soil is excavated and stockpiled. Then, the excavated areas are divided into grids to ensure proper sampling of the ground layer. Analytical results are compared to the clearance values in the work plan. If necessary, more soil excavation and sampling occur until sample results are at or below the clearance values. Once ballast and soil are removed, stockpiled, and sampled, this material is sent to the appropriate regulated disposal facilities. Clean soil and ballast are then backfilled into the excavated and cleaned areas.

In the Moment Videos

EPA released several in the moment videos to highlight different parts of the train derailment response. These short videos feature EPA experts explaining topics such as air monitoring, soil sampling, truck decontamination, and laboratory testing. These videos can be found on the “EPA Regions” “EPA Regions” YouTube page.

Two people sampling excavated material from the north track
Crews sampling excavated material from the north track
Excavated ballast and soil along the north track
Excavated ballast and soil along the north track
Man standing in the stream with equipment
Stream cleaning in Leslie Run

The Week Ahead

At the Derailment Site

  • Excavation will continue on the north track. Sampled and cleared areas will be backfilled with clean material.
  • Air monitoring mobile laboratories will continue driving around the perimeter of the site to monitor for butyl acrylate.
  • Engineering controls have been implemented to help control dust.
  • Taggart Street remains closed to the public.

In the Greater Community

  • EPA’s Community Welcome Center at 25 North Market Street in East Palestine remains open to the public Monday through Friday from 8 a.m. to 8 p.m. and Saturday from 10 a.m. to 4 p.m. (closed on Sundays).
  • The Way Station will host EPA for an update on site progress at 109 West Rebecca Street on May 18, from 6:00 to 7:00 p.m.
  • Cleanup will continue down Leslie Run.
  • Residents may notice air monitoring vehicles around the work site in the evenings. These vehicles are there to monitor the air quality.

Community Corner

The East Palestine Area Chamber of Commerce will host its annual street fair from May 24 to 27. During this time, Market Street will be closed to vehicle traffic all day for organizations to set up at the fair. Local businesses and organizations will offer rides, games, and food during the fair. EPA will host a booth for visitors with educational materials and activities for children.

Black and white 1969 Streetfair, image courtesy of East Palestine Chamber of Commerce
1969 Streetfair, image courtesy of East Palestine Chamber of Commerce

Did You Know?

Site Status Check
as of May 12

  • train tracks drawing

    North Track:
    Estimated 50% complete
    South Track: In operation

  • stream drawing

    Leslie Run: Cleanup work started and will continue

  • waste truck drawing

    Sulphur Run: Bypass carries upstream water past derailment site

  • 16.6 million est. gallons of wastewater shipped offsite
  • 39,348 est. tons of solid waste shipped offsite

Data Validation

EPA uses validated data to help make decisions regarding cleanups. Data validation is independent from sampling or analysis. The validation of data requires that appropriate quality assurance and quality control (QA/QC) procedures are followed. In addition, proper documentation must be included for all data generated both in the lab and in the field. Professionals trained in data validation may “flag” data when QA/QC criteria are not met.

EPA follows a detailed data collection and data validation process:

  1. Planning happens for what samples to collect and for what purpose.
  2. Samples are collected for laboratory analysis.
  3. Preliminary results are reported from the lab.
  4. At the lab chemists conduct a review so final data can be reported.
  5. Final results from the lab are shared with independent reviewers–usually EPA contractors required to be separate and independent from samplers or the lab.
  6. Data validators check data, and this is documented in the data validation report. Visit the Data Validation Reports page.

Soil Sampling

On public and private property, soil samples have been collected at two different depths as a first step for evaluating whether shallow soil has been impacted by the derailment.

EPA oversaw the sample collection of surface soil from two depths: 0 to 1 inch and 1 to 6 inches. EPA compared the results of the deeper sample to the results of the shallower sample to understand the historical soil makeup. Initial sampling results show similar results between shallow soil (0 to 1 inches) and deeper soil (1 to 6 inches).

Two people taking soil samples

Top 3 Questions of the Week

  • What is EPA’s role in sampling?

  • What is being done to control dust?

  • Why was the well water priority zone boundary extended?

There are no results at this time.

In Case You Missed It

SAFETY MINUTE

If you smell an odor and have concerns, you may contact the Residential Hotline at 330-849-3919. The Hotline is open 24 hours a day, 7 days a week. A community strike team will mobilize to an outdoor public area near the location of concern to perform air monitoring, document any odors, and deploy an air sample for butyl acrylate, as appropriate. A mobile laboratory may also be used to sample for butyl acrylate. If desired, a toxicologist will call you to discuss the sampling result when it is received.

information series in basement of church in east palestine

The Way Station and First United Presbyterian Church hosted an informational session on May 11 to discuss surface water. At this meeting, Ohio EPA presented information about the status of the cleanup of Leslie and Sulphur Runs, how waterways are assessed for contamination, and the impact of the derailment downstream. A recording of the presentation will be available on EPA’s East Palestine website. 


Key Community Events This Week

On May 18, The Way Station and First United Presbyterian Church will host an informational session to give an update on site progress. The session will be from 6 to 7:00 p.m. at the First United Presbyterian Church at 109 West Rebecca Street in East Palestine.

New EPA Welcome Center Hours:

  • Monday through Friday: 8 a.m. – 8 p.m.
  • Saturday: 10 a.m. – 4 p.m.

Please contact EPA’s Information Line at 866-361-0526 if you have any questions.


Community Health Resource List

Pennsylvania Residents:
Call the Department of Health Hotline (877-PA-HEALTH) to connect with a nurse to find appropriate local health care service.
Ohio Residents:The East Palestine Clinic is located at 139 North Walnut. It’s staffed by physicians, registered nurses, and mental health specialists. Call 330-383-6020 to make an appointment.   
•    The clinic operates Monday through Thursday from 9 a.m. to 5 p.m.

About This Publication

This weekly newsletter is being developed through a joint effort of state, federal agencies, and community organizations. If you would like more information about topics discussed, please visit East Palestine, Ohio Train Derailment Emergency Response website or call EPA’s Information Line at 866-361-0526.

PDF version:  Newsletter: East Palestine Train Derailment Response, 5-16-2023 (pdf) (2 MB)

East Palestine, Ohio Train Derailment

  • East Palestine, Ohio Train Derailment Home
  • Operational Updates
  • Resources for Affected Residents
    • Public Health Resources
    • Home and Office Cleaning
    • Settlement Update
  • Air Monitoring and Sampling Data
    • About Air Monitoring
    • Air Sampling Data
    • Air Monitoring Documents
  • Soil and Sediment Data
    • Soil and Sediment Sampling Data
    • Phase One Residential, Commercial, and Agricultural Soil Sampling Results
    • Soil and Sediment Sampling Results Quick Reference Guide
    • Event Reconstruction Plume Map
    • City Park Soil Sampling Results
    • Qualitative Sheen Assessment Results
    • Response to Inaccurate Dioxin Reporting
    • Workplan to Cleanup Sediment in Sulphur and Leslie Runs
  • Water Sampling Data
    • Water Management Update
  • Data Validation Reports: Air, Soil, Water
  • Photos
  • Videos
  • Newsletters
  • Legal and other documents
    • About Executive Order 14108
    • Clean Water Act Administrative Order and Directives
    • Full Characterization Workplan
  • Frequently Asked Questions
    • About Soil Sampling
    • Taggart Street Reopening
  • Background
  • News Releases
Contact Us About the East Palestine, Ohio Train Derailment
Contact Us About the East Palestine, Ohio Train Derailment to ask a question, provide feedback, or report a problem.
Last updated on February 26, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.