Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Guidance
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Newsroom
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Tribal Programs in the Pacific Southwest
  3. Tribal Clean Water Act Programs
  4. Water Quality Certifications

U.S. Army Corps of Engineers Nationwide Permit Certification Actions

On this page:
  • Background
  • Certification Actions
  • Documents
  • Definitions

Background

This page provides a summary table of the EPA section 401 water quality certification actions for the 57 Nationwide Permits issued by the U.S. Army Corps of Engineers (USACE). These permits and certification actions will expire on March 14, 2026.

EPA Region 9 granted programmatic certification with conditions to 23 of the nationwide permits and denied certification to 9 of the nationwide permits. Project proponents will need to apply for an individual project certification for any nationwide permits that were denied programmatic certification. The remaining 25 nationwide permits either had 401 certification waived or a certification request was not made by the USACE for the permit. Certification letters and conditions as well as definitions are also provided on this page.

The following table includes a summary of Region 9 certification actions on the 57 Nationwide Permits issued by the USACE (note permit numbers 26 and 47 are not used). These permits and certification actions will expire on March 14, 2026.

Certification Actions

EPA Region 9 USACE Nationwide Permit Certification Actions
Nationwide PermitEPA Certification (see below for definitions)
01. Aids to NavigationNo cert. request
02. Structures in Artificial CanalsNo cert. request
03. MaintenanceGranted with Conditions
04. Fish and Wildlife Harvesting, Enhancement, Attraction Devices and ActivitiesWaived
05. Scientific Measurement DevicesGranted with Conditions (pdf) (2021 Letter)
06. Survey ActivitiesGranted with Conditions (pdf) (2021 Letter)
07. Outfall Structures and Associated Intake StructuresGranted with Conditions (pdf) (2021 Letter)
08. Oil and Gas Structures on the Outer Continental ShelfNo cert. request
09. Structures in Fleeting and Anchorage AreasNo cert. request
10. Mooring buoysNo cert. request
11. Temporary Recreation StructuresNo cert. request
12. Oil or Natural Gas Pipeline ActivitiesDenied, Individual 401 Certification Required
13. Bank StabilizationGranted with Conditions (pdf) (2021 Letter)
14. Linear Transportation ProjectsGranted with Conditions (pdf) (2021 Letter)
15. U.S. Coast Guard Approved BridgesWaived
16. Return Water from Upland Contaminated Disposal AreasWaived
17. Hydropower ProjectsWaived
18. Minor DischargesGranted with Conditions (pdf) (2021 Letter)
19. Minor DredgingGranted with Conditions (pdf) (2021 Letter)
20. Response Operations for Oil or Hazardous SubstancesGranted with Conditions (pdf) (2021 Letter)
21. Surface Coal Mining ActivitiesWaived
22. Removal of VesselsWaived
23. Approved Categorical ExemptionsGranted with Conditions (pdf) (2021 Letter)
24. Indian Tribe or State Administered Section 404 ProgramNo cert. request
25. Structural DischargesGranted with Conditions (pdf) (2021 Letter)
27. Aquatic Habitat Restoration, Enhancement and Establishment ActivitiesGranted with Conditions (pdf) (2021 Letter)
28. Modifications of Existing MarinasNo cert. request
29. Residential DevelopmentsDenied, Individual 401 Certification Required
30. Moist Soil Management for WildlifeWaived
31. Maintenance of Existing Flood Control FacilitiesGranted with Conditions (pdf) (2021 Letter)
32. Completed Enforcement ActionsGranted with Conditions (pdf) (2021 Letter)
33. Temporary Construction, Access, and DewateringGranted with Conditions (pdf) (2021 Letter)
34. Cranberry Production ActivitiesWaived
35. Maintenance Dredging of Existing BasinsNo cert. request
36. Boat RampsGranted with Conditions (pdf) (2021 Letter)
37. Emergency Watershed Protection and RehabilitationGranted with Conditions (pdf) (2021 Letter)
38. Cleanup of Hazardous and Toxic WasteGranted with Conditions
39. Commercial and Institutional DevelopmentsGranted with Conditions (pdf) (2020 Letter)
40. Agricultural ActivitiesDenied, Individual 401 Certification Required
41. Reshaping Existing Drainage DitchesGranted with Conditions (pdf) (2021 Letter)
42. Recreational FacilitiesDenied, Individual 401 Certification Required
43. Stormwater Management FacilitiesDenied, Individual 401 Certification Required
44. Mining ActivitiesDenied, Individual 401 Certification Required
45. Repair of Uplands Damaged by Discrete EventsGranted with Conditions (pdf) (2021 Letter)
46. Discharges in DitchesGranted with Conditions (pdf) (2021 Letter)
48. Commercial Shellfish Mariculture ActivitiesWaived
49. Coal Remining ActivitiesWaived
50. Underground Coal Mining ActivitiesWaived
51. Land-Based Renewable Energy Generation FacilitiesDenied, Individual 401 Certification Required
52. Water-Based Renewable Energy Generation Pilot ProjectsWaived
53. Removal of Low Head DamsWaived
54. Living ShorelinesWaived
55. Seaweed and Mariculture ActivitiesWaived
56. Finfish Mariculture ActivitiesWaived
57. Electric Utility Line and Telecommunications ActivitiesDenied, Individual 401 Certification Required
58. Utility Line Activities for Water and Other SubstancesDenied, Individual 401 Certification Required
59. Water Reclamation and Reuse FacilitiesGranted with Conditions (pdf) (2021 Letter)

Documents

Free viewers and readers are available to access documents on our website. If you encounter issues with assistive technology, please contact us.

  • EPA Letter to U.S. Army Corps of Engineers South Pacific Division (pdf) (431.49 KB, 2022)
    Programmatic Clean Water Act, Section 401 Certification of the Draft 2021 Nationwide Permits for Tribal Lands within the Region 9 coverage area of the U.S. Environmental Protection Agency.
  • EPA Letter to U.S. Army Corps of Engineers South Pacific Division (pdf) (462.7 KB, 2020)
    Programmatic Clean Water Act, Section 401 Certification of the Draft 2020 Nationwide Permits for Tribal Lands within the Region 9 coverage area of the U.S. Environmental Protection Agency.

Definitions

  • Deny
  • Discharge
  • Grant
  • Grant with Conditions
  • Waive

Deny

States and Tribes deny certification if the activity and discharge will not comply with the applicable sections of the CWA and appropriate requirements of state and Tribal law. The denial of §401 certification by a state or Tribe prohibits the federal agency from issuing the permit or license in question.

Discharge

Under the CWA §401 there does not have to be an actual discharge or a "discharge of a pollutant." The statute states that, "[a]ny…federal license or permit to conduct any activity … which may result in a discharge." Consequently, the discharge need not be a certainty, only that it "may" occur should the permit or license be granted. However, if no discharge may occur, no water quality certification is required. For example, when a RHA §10 permit is required for the hanging of power lines across a navigable river (RHA §10 water) without a potential discharge to the water, the Corps typically has not sought water quality certification.

In addition, the potential discharge does not need to involve an addition of pollutants. Section 401 certification can be triggered not only where there is discharge of a pollutant (such as would be authorized by §402 or §404 permits), but also where there is a discharge not involving addition of a pollutant, such as water released from the tailrace of a dam. As the U.S. Supreme Court has stated, "[w]hen it applies to water, 'discharge' commonly means a 'flowing or issuing out'" and an addition of a pollutant is not "fundamental to any discharge." A lower court has ruled that allowing more water to flow through a dam's turbines is a discharge for §401 purposes.

The third element required for §401 certification to apply is that the potential discharge must be into a water of the U.S. The term "waters of the U.S." is defined in EPA and Corps regulations and applies to all CWA programs. Note, however, that once §401 has been triggered due to a potential discharge into a water of the U.S., additional waters may become a consideration in the certification decision if it is an aquatic resource addressed by "other appropriate provisions of state [Tribal] law."

Grant

The granting of §401 water quality certification to an applicant for a federal license or permit signifies that the certifying authority has determined that the proposed activity and discharge will comply with water quality standards as well as the other identified provisions of the CWA and appropriate requirements of state or Tribal law.

In some circumstances, the provisions states, or Tribes would wish to see reflected in the permit or license can be achieved through early discussions with the applicants, rather than through formally conditioning the 401 certification. For example, incorporation of measures such as the use of Best Management Practices (BMPs) and practices needed for Total Maximum Daily Load (TMDL) implementation are often added to projects during this stage. BMPs can include such actions as using constructed wetlands or bioretention areas rather than retention ponds for catching nutrients and sediments.

Grant with Conditions

The certifying authority may include limitations or conditions in their certifications as necessary to ensure compliance with water quality standards and other provisions of the CWA and appropriate requirements of state or Tribal law.

Waive

A certifying authority may waive §401 certification, either explicitly, through notification to the applicant, or by the certification agency not taking action. If action is not taken on a certification request, "within a reasonable time (which shall not exceed one year)," the state or authorized Tribe has waived the requirement for certification. The amount of time allowed for action on a certification application is determined by the Federal agency issuing the license or permit, while the certifying agency determines what constitutes a "complete application" that starts the timeframe clock. However, the onus for applying for water quality certification lies with the permit or license applicant, and waiver cannot occur without a request for certification.

Tribal Programs in the Pacific Southwest

  • Federally Recognized Tribes
  • Newsletters
  • GAP Funding
  • RTOC
    • Contacts
    • Guidance Documents
    • Meeting Materials
    • Registration
    • Workgroup Session/Agenda Request
    • RTOC Charter
    • Strategic Plan
  • Tribal Consultation
  • Tribal Air Programs
    • Tribal CAA Funding
  • Tribal Clean Water Act Programs
    • Water Pollution Control Grants (CWA §106)
    • Nonpoint Source Pollution Control (CWA §319)
    • Wetlands Program Development Grants (CWA §104(b)(3))
    • Clean Water Indian Set-Aside (CWISA) Program
    • Tribal Water Grant Fact Sheets
    • Water Quality Certifications
    • Water Quality Standards
    • Project Officers and Tribal Liaisons
    • Tribal Clean Water Act (CWA) Workshop
    • Clean Water Emerging Contaminant (EC) Program
  • Tribal Drinking Water Programs
    • Drinking Water Tribal Set-Aside (DWTSA) Program
    • Drinking Water Emerging Contaminants Programming
    • Lead Service Line Replacement Program
    • PFAS Drinking Water Sampling Project
    • School Drinking Water Lead Testing Project
  • Green Building Tools for Tribes
  • Navajo Nation Abandoned Uranium Mines
Contact Us
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on August 18, 2026
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.