Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. East Palestine, Ohio Train Derailment

Newsletter: East Palestine Train Derailment Response, 5-23-2023

Newsletter serving Serving East Palestine, Negley, Darlington, and surrounding communities

On this page:
  • Progress Made
  • The Week Ahead
  • Community Corner
  • Did You Know?
  • Site Status Check
  • Top 3 Questions of the Week
  • In Case You Missed It
  • Key Community Events This Week

  •  
  •  
  •  
  •  
  •  
  •  
  •  

Progress Made

East Palestine Excavation Area
East Palestine Excavation Area

Excavation of Controlled Burn Area

Workers excavated the controlled burn area. Portions of this area were excavated down to roughly 8 feet. The area will be backfilled once soil sample results are reviewed, and the area is approved for backfill.

Nighttime Air Monitoring

Unified Command has 24/7 air monitoring in place. Recently, community members brought to EPA’s attention odors at night in two residential areas. The odors have been thoroughly investigated and are unrelated to the derailment site.

Asbestos Found in April Not Related to the Train Derailment

EPA has received questions from residents about information that we shared back in April regarding discovered asbestos containing material (ACM). During site cleanup activities, ACM was discovered near one of the work areas. The ACM was unrelated to the incident. The material was not included within either the train or the materials being transported. To protect the workers in the area and facilitate the remediation of the incident, Norfolk Southern utilized Ohio licensed asbestos abatement contractors to remove the material for offsite management and disposal in accordance with associated regulations.

East Palestine Cleanup Area Aerial Photo

The Week Ahead

At the Derailment Site

  • Excavation of the north track is almost complete. Sampling of excavated areas will continue. The areas bordering the tracks will be addressed next.
  • Expect increased truck traffic near the derailment site. Typically, up to 100 truckloads of soil or water leave the site every day. Weekends have less truck traffic.
  • Work will continue during the week of the fair. Trucks will be rerouted during this time.
  • Taggart Street remains closed to the public.

In the Greater Community

  • EPA’s Community Welcome Center will be closed from May 24 to 29 for the East Palestine Street Fair and holiday weekend. EPA will have a table at the fair and EPA on-site staff can be reached by calling (330) 775-6517.
  • Assessment work will continue down Leslie Run to determine next steps.

Community Corner

EPA community involvement coordinators visited an East Palestine High School science class last Tuesday and presented on the response, including progress made at the train derailment site. Students discussed their air-quality findings from the PurpleAir and Air Beam sensors EPA loaned them earlier this year. One student noticed slightly elevated levels of particulate matter during some evenings, which could have been from pollen or bonfires. During the Q&A period, students asked thought-provoking questions about track excavation and interpreting air sensor results.

East Palestine school bus in front of East Palestine High School
School bus in front of East Palestine High School - "Go Bulldogs!"

Did You Know?

Site Status Check
as of May 19

  • train tracks drawing

    North Track:
    Estimated 75% complete
    South Track: In operation

  • stream drawing

    Leslie Run: Stream assessments are ongoing to determine next steps
    Sulphur Run: Bypass carries upstream water past derailment site

  • waste truck drawing

    100 trucks a day carry waste off-site

  • 17.8 million est. gallons of wastewater shipped offsite
  • 44,717 est. tons of solid waste shipped offsite

Dust mats are used over the inlets on the roadways around the derailment site to keep particles, such as dust and dirt, out of the stormwater sewer system. The system, which collects water from sources, such as rainfall, water trucks, and snowmelt, discharges directly to the local creeks and tributaries. Excessive particles, such as dust, in the storm sewer catch basin can clog the catch basin and block water flow, so it is important to keep them from entering the system. If you see these mats around town, please do not remove them as they are helping to protect water bodies and aquatic habitats. The storm sewers do not connect to the pipes in your house. You can watch our latest in the moment video about storm sewers in East Palestine on the EPA webpage to learn more.

Dust Mat covering a storm drain in East Palestine
Dust Mat covering a storm drain in East Palestine

Top 3 Questions of the Week

There are no results at this time.
There are no results at this time.

In Case You Missed It

information series in basement of church in east palestine

On May 18, the Way Station and First United Presbyterian Church hosted “Track Talk” an information session on site progress. An EPA on-scene coordinator updated community members on progress at the north track excavation, the timeline for cleanup, and answered questions. A recording of the session can be found on our website.


Key Community Events This Week

The East Palestine Area Chamber of Commerce will host its annual street fair beginning at 5 p.m. May 24 to May 26, and beginning at 1 p.m. Saturday, May 27. During this time, the Welcome Center will be closed. During fair hours, EPA will host a booth for visitors with activities for children and educational material. Community members can still reach on-site EPA staff at 330-775-6517 for train derailment concerns.

EPA Welcome Center:

EPA’s Community Welcome Center is a one-stop shop where residents can speak with EPA team members and make appointments with our experts. Give the Welcome Center a call at 330-775-6517 or stop by at 25 N. Market St.

New hours of operation:

  • Monday through Friday: 8 a.m. – 8 p.m.
  • Saturday: 10 a.m. – 4 p.m.
  • Sunday: Closed

(The Center will be closed May 24 to May 29.)


About This Publication

This weekly newsletter is being developed through a joint effort of state, federal agencies, and community organizations. If you would like more information about topics discussed, please visit East Palestine, Ohio Train Derailment Emergency Response website or call EPA’s Information Line at 330-775-6517.

PDF version:  Newsletter: East Palestine Train Derailment Response, 5-23-2023 (pdf) (1.59 MB)

East Palestine, Ohio Train Derailment

  • East Palestine, Ohio Train Derailment Home
  • Operational Updates
  • Resources for Affected Residents
    • Public Health Resources
    • Home and Office Cleaning
    • Settlement Update
  • Air Monitoring and Sampling Data
    • About Air Monitoring
    • Air Sampling Data
    • Air Monitoring Documents
  • Soil and Sediment Data
    • Soil and Sediment Sampling Data
    • Phase One Residential, Commercial, and Agricultural Soil Sampling Results
    • Soil and Sediment Sampling Results Quick Reference Guide
    • Event Reconstruction Plume Map
    • City Park Soil Sampling Results
    • Qualitative Sheen Assessment Results
    • Response to Inaccurate Dioxin Reporting
    • Workplan to Cleanup Sediment in Sulphur and Leslie Runs
  • Water Sampling Data
    • Water Management Update
  • Data Validation Reports: Air, Soil, Water
  • Photos
  • Videos
  • Newsletters
  • Legal and other documents
    • About Executive Order 14108
    • Clean Water Act Administrative Order and Directives
    • Full Characterization Workplan
  • Frequently Asked Questions
    • About Soil Sampling
    • Taggart Street Reopening
  • Background
  • News Releases
Contact Us About the East Palestine, Ohio Train Derailment
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on February 26, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.