Learn the Issues
-
Mystic River Watershed Water Quality Subcommittee Meeting, March 3, 2016
Document(s) from the March 3, 2016 Water Quality Subcommittee Meeting for the Mystic River Watershed.
-
Hudson School (Collegeville) Voluntary Cleanup Report, Walter Coke, Inc., Birmingham, Alabama
Hudson School (Collegeville) Voluntary Cleanup Report, Walter Coke, Inc., Birmingham, Alabama
-
Hudson School (Collegeville) Voluntary Investigation and Cleanup Report
Hudson School (Collegeville) Voluntary Investigation and Cleanup Report
-
Health and Safety Plan Walter Coke Residential Sampling in Birmingham, Alabama
Health and Safety Plan Walter Coke Residential Sampling in Birmingham, Alabama. June 30, 2011
-
EPA Approval of Community Involvement Plan. Jan 25, 2013
EPA Approval of Community Involvement Plan. Jan 25, 2013.
-
Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama
Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama.
-
Site Specific Health and Safety Plan
Site Specific Health and Safety Plan. October 9, 2012. Walter Coke. Birmingham, Alabama.
-
Final Community Involvement Plan (Revision 1.0)
Final Community Involvement Plan (Revision 1.0)
-
EPA Approval of Risk Assessment Work Plan, Region 1.1
EPA Approval of Risk Assessment Work Plan, Region 1.1.
-
Final Vapor Intrusion Characterization Work Plan (Revision 1.0) Part 1
Final Vapor Intrusion Characterization Work Plan (Revision 1.0) Part 1
-
Mineral Wool Piles - Sample Analysis Report. Revision 5.
Mineral Wool Piles - Sample Analysis Report. Revision 5. Sample Collection and Analysis at the Walter Coke Facility.
-
Final Risk Assessment Work Plan (Revision 1.1)
Final Risk Assessment Work Plan (Revision 1.1)
-
Walter Groundwater Interim Measures Work Plan Part 2
Walter Groundwater Interim Measures Work Plan Part 2
-
Final Groundwater Interim Measures Sampling and Analysis Plan
Final Groundwater Interim Measures Sampling and Analysis Plan
-
EPA Approval of Groundwater Interim Measures Plans and Commencement of Work
EPA Approval of Groundwater Interim Measures Plans and Commencement of Work
-
Mystic River Watershed Municipal Subcommittee Meeting, July 20, 2011
Document(s) from the July 20, 2011 Municipal Subcommittee Meeting for the Mystic River Watershed.
-
Facility Cleanup
This first overall 2-page fact sheet describes the facility cleanup work being conducted at the Cavenham Forest Industries, LLC.
-
Site-Specific Mammalian and Avian Wildlife Screening Level Exposure Evaluation
The second report (21-pages) presents the ecological risk assessment for higher level organisms (bird and mammalian receptors), using the raccoon and Great Blue Heron as indicator species.
-
Resource Conservation & Recovery Act (RCRA) Permit Pursuant to the Hazardous & Solid Waste Amendments (HSWA)
RCRA Permit Pursuant to the Hazardous & Solid Waste Amendments.
-
EPA Approval Letter for Ecological-Related Risk
The EPA approval letters for the ecological risk assessments (2-pages) provides feedback to the regulated facility, Cavenham Forest Industries, that this report was acceptable.