Learn the Issues
-
Walter Groundwater Interim Measures Work Plan Part 2
Walter Groundwater Interim Measures Work Plan Part 2
-
Final Groundwater Interim Measures Sampling and Analysis Plan
Final Groundwater Interim Measures Sampling and Analysis Plan
-
EPA Approval of Groundwater Interim Measures Plans and Commencement of Work
EPA Approval of Groundwater Interim Measures Plans and Commencement of Work
-
Mystic River Watershed Municipal Subcommittee Meeting, July 20, 2011
Document(s) from the July 20, 2011 Municipal Subcommittee Meeting for the Mystic River Watershed.
-
Facility Cleanup
This first overall 2-page fact sheet describes the facility cleanup work being conducted at the Cavenham Forest Industries, LLC.
-
Site-Specific Mammalian and Avian Wildlife Screening Level Exposure Evaluation
The second report (21-pages) presents the ecological risk assessment for higher level organisms (bird and mammalian receptors), using the raccoon and Great Blue Heron as indicator species.
-
Resource Conservation & Recovery Act (RCRA) Permit Pursuant to the Hazardous & Solid Waste Amendments (HSWA)
RCRA Permit Pursuant to the Hazardous & Solid Waste Amendments.
-
EPA Approval Letter for Ecological-Related Risk
The EPA approval letters for the ecological risk assessments (2-pages) provides feedback to the regulated facility, Cavenham Forest Industries, that this report was acceptable.
-
Draft Hazardous Solid Waste Amendment (HSWA) Permit Renewal
The is presentation (17-slides) given by EPA’s Corrective Action Program, covers background, EPA’s perspective on the draft permit and a photography slideshow of facility conditions in 1987.
-
Site-Specific Aquatic Wildlife Screening Level Exposure Evaluation
The first report (14-pages) presents the methodology and results of the ecological risk assessment for benthic invertebrates and fish in Turkey Creek near the target facility.
-
Turkey Creek Human Health Risk Assessment
Turkey Creek Human Health Risk Assessment.
-
EPA Approval Letter for Human Health Risk Assessment
The EPA approval letters for the human health risk assessment (2-pages) provides feedback to the regulated facility, Cavenham Forest Industries, that this report was acceptable.
-
PERMIT RENEWAL FACT SHEET
A 6-page Fact sheet focuses on describing the latest 10 year renewal for the draft EPA Hazardous and Solid Waste Amendments (HSWA) permit.
-
Control And Containment Design Report
his work plan (571-pages) is called the “SWMU-3-1 and 3-4 Control and Containment Design Report” was written to be in compliance with new FEMA requirements that the design must not create any positive change in the 100 year flood elevation.
-
September 12, 2014 Letter from Jan B. Rogers
September 12, 2014 Letter from Jan B. Rogers
-
Feasibility Study at LCP Chemical Superfund Site
Feasibility Study at LCP Chemical Superfund Site.
-
Proposed Plan Summary
Proposed Plan Summary. LCP Chemicals Marsh.
-
Resource Conservation and Recovery Act (RCRA) Facility Presentation
The first presentation (86-slides), provided by Environmental Management Services (contractor to Cavenham Forest Industries) covers work progress being undertaken with respect to the corrective action.
-
CO2 Sparging Phase 1 Full-Scale Implementation and Monitoring Report
CO2 Sparging Phase 1 Full-Scale Implementation and Monitoring Report
-
Superfund Proposed Plan
Superfund Proposed Plan