Process Control for Lagoons
Although similar, process control requirements for lagoons and small wastewater treatment plants can differ significantly in key areas. For system managers considering modifications to an existing lagoon or an upgrade to a mechanical plant, understanding the specific needs of each system is essential to maintaining compliance with NPDES permits. This presentation provides an in-depth comparison of process control requirements and best management practices (BMPs), from preliminary treatment through to final discharge, for both lagoons and small mechanical treatment plants.
Presenters
Mike Beck
Mike Beck is a Senior Wastewater Specialist at ERG and a certified wastewater operator in both California and Virginia with 14 years of environmental experience including operating and managing industrial and municipal treatment systems. In his position at ERG, he serves as an EPA Credentialed Inspector for Clean Water Act NPDES compliance evaluation inspections, a task lead providing technical assistance lead for dozens of small and disadvantaged communities struggling with permit compliance, and a technical expert witness for the Department of Justice in CWA compliance cases. He worked as operations manager for a 16 MGD activated sludge plant and a wastewater engineer for discharges from a pharmaceutical manufacturer.
Contact: Mike.Beck@erg.com