Background Document and Appendices for Proposed Comprehensive Procurement Guideline (CPG) III and Draft Recovered Materials Advisory Notice (RMAN) III
This document explains EPA’s overall objectives, the process for designating procurement items, and the methodology used in recommending recovered materials content levels for items designated in the proposed CPG III. In addition, the proposed CPG III and Draft RMAN III background document lists the recommended procurement practices for designated items.