EPA Approved Air Quality Regulations for Guam
The following document and table contain the EPA approved Air Quality Regulations for Guam. EPA's Pacific Southwest Office maintains this document and table and will update them to reflect any changes in the official tables codified in the Code of Federal Regulations. To find the status of SIP submittals, visit SIP Status Reports.
The official SIPs, TIPs, and FIPs are contained in regulations promulgated in the Federal Register and codified in the U.S. Code of Federal Regulations (CFR). EPA’s web-versions of the approved SIPs, TIPs, and FIPs are for reference. While we make every effort to maintain the accuracy of the files accessible here, inconsistencies may occur. If you find any errors in these files, or experience a problem reading a document with assistive technology, please contact us.
EPA Approved and Compiled Rules and Regulations
EPA Approved Air Quality Regulations for Guam
| State Citation | Title/Subject | Effective Date | EPA approval Date | Explanation |
|---|---|---|---|---|
| Chapter 01 | Definitions (1.1-1.17, 1.20-1.43) | 8/24/1979 | 05/12/81, 46 FR 26303 | |
| Chapter 02.1-02.2 | Ambient Air Quality Standards | 8/8/1973 | 12/19/78, 43 FR 48638 | |
| Chapter 02.3-02.4 | Ambient Air Quality Standards | 1/13/1972 | 5/31/72, 37 FR 10842 | |
| Chapter 03.01-03.09 | Permits Required, etc. | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 03.10, 3.11 and 03.13 | Responsibility of the Permit Holder, etc. (for complex sources only) | 8/8/1973 | 12/19/78, 43 FR 48638 | |
| Section 1104.26 | Permit Compliance | 06/03/2005 | 2/27/06, 71 FR 9716 | |
| Chapter 04.1-04.4 | Monitoring, Records and Reporting | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 05.1-05.2 | Sampling and Testing Methods | 1/13/1972 | 5/31/72, 37 FR 10842 | |
| Chapter 05.3 | Sampling and Testing Methods | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 06.1 | Control of Open Burning | 1/13/1972 | 5/31/72, 37 FR 10842 | |
| Chapter 06.2 | Exceptions | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 06.3 | Outdoor Cooking Waiver | 1/13/1972 | 5/31/72, 37 FR 10842 | |
| Chapter 07.1 | Control of Particulate Emissions from Process Industries | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 07.2-07.3 | Process Weight | 8/8/1973 | 12/19/78, 43 FR 48638 | |
| Chapter 07.4-07.5 | Process Weight Table | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 08.1-08.2 | Control of Fugitive Dust | 8/8/1973 | 12/19/78, 43 FR 48638 | |
| Chapter 08.3-08.6 | Specific Requirements | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 08.8-08.9 | Compliance Schedule | 8/8/1973 | 12/19/78, 43 FR 48638 | |
| Chapter 09.1-09.9 | Control of Particulate Emission from Incinerator; Design and Operation | 1/13/1972 | 5/31/72, 37 FR 10842 | |
| Chapter 10.1-10.2 | Control of Visible Emission of Particulates for Stationary Sources | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 11.1-11.3 | Control of Odors in Ambient Air | 1/13/1972 | 5/31/72, 37 FR 10842 | |
| Chapter 12.1; 12.2 & 12.4 | Air Pollution Emergencies | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 13.1 | Control of Sulfur Dioxide Emissions | 8/24/1979 | 5/12/81, 46 FR 26303 | For All Sources except Tanguisson Power Plant. |
| Chapter 13.1 | Addendum to 13.1 | 1/28/1980 | 5/12/81, 46 FR 26303 | Compliance Order for Inductance. |
| Chapter 13.2 | Control of Sulfur Dioxide Emissions | 1/13/1972 | 5/31/72, 37 FR 10842 | For Tanguisson Power Plant only. |
| Chapter 13.3 & 13.4 | Control of Sulfur Dioxide Emissions | 8/24/1979 | 3/06/80, 45 FR 14559 | |
| Chapter 14.1-14.7 | Motor Vehicle Pollution Control | 8/24/1979 | 5/12/81, 46 FR 26303 | |
| Chapter 17.1-17.4 | Appeal Procedures, Circumvention, Severability, and Effective Date | 12/11/1981 | 9/30/82, 47 FR 43054 |
Post-2011 Compilation of Rules and Regulations
Title 22, Division 1, Chapter 1
Article 8
| State Citation | Title/Subject | Effective Date | EPA Approval Date | Explanation |
|---|---|---|---|---|
| Section 1801 | Applicability Procedures | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.1 | Preconstruction Review Requirements | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.2 | Nonattainment Major New Source Review (NSR) Permit Requirement | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.3 | Emission Calculation Requirements to Determine New Source Review (NSR) Applicability | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.4 | Major Sources with Plant-Wide Applicability Limitations | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.5 | Projects That Rely on a Projected Actual Emissions Test | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.6 | Secondary Emissions | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.7 | Stationary Sources | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1801.8 | Environmental Protection Agency Determination | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1802 | Definitions | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1803 | Application Requirements | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1803.1 | Application Submittal | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1803.2 | Application Content | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1803.3 | Lowest Achievable Emission Rate (LAER) | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1803.4 | Certification of Compliance | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1803.5 | Analysis of Alternatives | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1803.6 | Application Fees | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1804 | Emissions Offsets | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1804.1 | Offset Requirements | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1804.2 | Timing | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1804.3 | Quantity | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1804.4 | Emission Reduction Requirements | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1804.5 | Restrictions on Trading Pollutants | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1805 | Administrative Requirements | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1805.1 | Ambient Air Quality Standards | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1805.2 | Air Quality Models | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1805.3 | Stack Height Procedures | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1806 | Nonattainment Major New Source Review (NSR) Permit—Decision | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1806.1 | Preliminary Decision | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1806.2 | Nonattainment Major New Source Review (NSR) Permit—Preliminary Decision Requirements | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1806.3 | Nonattainment Major New Source Review (NSR) Permit Contents | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1806.4 | Nonattainment Major New Source Review (NSR) Permit—Final Decision | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1806.5 | Ongoing Permit Requirements | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1806.6 | Technology Clearinghouse | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1807 | Source Obligations | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1807.1 | Enforcement | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1807.2 | Termination | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1807.3 | Compliance | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1807.4 | Relaxation in Enforceable Limitations | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1808 | Public Participation | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1809 | Plant-Wide Applicability Limits (PAL) | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1810 | Invalidation | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |
| Section 1811 | Effective Date for Referenced Federal Regulations | 12/29/2022 | 9/18/2025, 90 FR 44987 | Submitted on March 13, 2025, as an attachment to a letter of the same date. |