Permit Documents for the Northeast Energy Associates, Bellingham, MA (Gas Turbine/Amended PSD Project)
Final Permit Documents
- Prevention of Significant Deterioration Permit for Northeast Energy Associates, 92B Depot Street, Bellingham, MA, Nominal 304 MW Combustion Turbine Combined Cycle Generating Facility, EPA Permit Number CR-88-PSD-R-001 (PDF) (16 pp, 679 K, December 23, 2008)
Public Notice and Comment Period Documents
- Public Notice of Federal Prevention of Significant Deterioration Permit and Public Comment Period, Northeast Energy Associates, 92B Depot Street, Bellingham, MA, EPA New England Draft PSD Permit Number CR-88-PSD-R-001 (PDF) (3 pp, 20 K, October 30, 2008)
Draft Permit Documents
- Prevention of Significant Deterioration Permit for Northeast Energy Associates, 92B Depot Street, Bellingham, MA, Nominal 304 MW Combustion Turbine Combined Cycle Generating Facility, EPA Proposed Permit Number CR-88-PSD-R-001 (PDF) (16 pp, 63 K)
- Fact Sheet: Northeast Energy Associates, 92B Depot Street, Bellingham, MA, EPA Draft Permit (PDF) (14 pp, 250 K, October 28, 2008)
- Oil-Fired Opacity Evaluation Bellingham Cogeneration Facility (PDF) (3 pp, 238 K, June 18, 2007)
- Oil-Fired Opacity Limit Bellingham Cogeneration Facility (PDF) (8 pp, 442 K, August 20, 2007)
- Startup & Shutdown Limits Bellingham Cogeneration Facility (PDF) (14 pp, 402 K, June 29, 2007)
- CO Startup & Shutdown Limits Bellingham Cogeneration Facility (PDF) (2 pp, 100 K, October 4, 2007)