Permit Documents for Northeast Gateway Energy Bridge Deepwater Port, Federal Waters of Massachusetts Bay
2014 Modification to Existing Permit LNG Regasification Vessel/DWP Project
Final Permit Documents
- Final Permit Decision for Northeast Gateway Energy Bridge LLC, Permit # RG1-DPA-CAA-01M (pdf) (4 MB, December 30, 2014)
Draft Permit Documents
- Public Notice of Federal Clean Air Act Permit Modification and Public Comment Period for Northeast Gateway Energy Bridge LLC (pdf) (151 K)
- Draft Permit Modification to Northeast Gateway Energy Bridge, LLC. Deepwater Port, Permit Number: RG1-DPA-CAA-01M (pdf) (197 K)
- Fact Sheet: Northeast Gateway Energy Bridge, LLC. Deepwater Port, Permit Modification (pdf) (303 K)
- Letter from USCG to EPA Re: Requirements for Oil-Fired Pilots on Excelerate LNG Carrier Boilers for the Northeast Gateway Deepwater Port Air Permit Modification (pdf) (2 MB, February 21, 2011)
- Letter from EPA to Excelerate Energy, L.P. Re: NSPS-NESHAP Applicability to the Proposed Aguirre GasPort Emission Units (pdf) (4 MB, April 11, 2013)
Application Materials
- Application for Minor Source Air Permit Modification (Northeast Gateway Energy Bridge Deepwater Port Project) (pdf) (2 MB, October 2008)
- Letter from Northeast Gateway Energy Bridge, LLC to EPA Re: Amendment to Permit Modification Application for Northeast Gateway Energy Bridge, LLC (pdf) (31 K, July 17, 2009)
- Re: Revised BACT analysis information (pdf) (2 MB, January 26, 2010)
- Northeast Gateway Energy Bridge LP (CAA Permit No. RG1-DPA-CAA-01) Supplemental Material for Main Boiler SO2 BACT Analysis and Auxiliary Generator CO Emissions Compliance (pdf) (11 MB, August 19, 2011)
- Northeast Gateway Energy Bridge LP (CAA Permit No. RG1-DPA-CAA-01) Clarification of Manufacturer Statement on Burner Lightings, Proposed Operating Restrictions for Diesel Engines, and Revised 1-hour SO2 Impacts (pdf) (5 MB, April 2, 2012)
- Comments on CAA Air Permit Modification Northeast Gateway Energy Bridge, LLC, Permit Number RG1-DPA-CAA-01 (pdf) (5 MB, October 28, 2014)
2007 Initial Permit for LNG Regasification Vessel/DWP Project
Final Permit Documents
- Authority to Construct Northeast Gateway Energy Bridge, LLC, Deepwater Port, Permit Number RG1-DPA-CAA-01 (pdf) (791 K, May 14, 2007)
- Northeast Gateway Energy Bridge, LLC Draft Air Permit RG1-DPA-CAA-01 Response to Comments (pdf) (901 K)
Comment Period Documents
- Comments by Excelerate Energy, L.L.C. (Mike Trammel) (pdf) (46 K, February 28, 2007)
Draft Permit Documents
- Proposed Authority to Construct Northeast Gateway Energy Bridge LLC Deepwater Port Permit Number RG1-DPA-CAA-01 (pdf) (127 K)
- Statement of Basis for Proposed Clean Air Act Permit Northeast Gateway Energy Bridge LLC (pdf) (290 K)
- Re: Air Quality Monitoring, Recordkeeping, and Reporting - Northeast Gateway Energy Bridge, LLC (pdf) (53 K, August 1, 2006)
- Specifications: Ultramat 23 (pdf) (696 K)
Application Materials
- Minor Source Air Permit Application (Northeast Gateway Energy Bridge Deepwater Port Project) (pdf) (2 MB, February 21, 2006)