We’ve made some changes to EPA.gov. If the information you are looking for is not here, you may be able to find it on the EPA Web Archive or the January 19, 2017 Web Snapshot.

PSD Permit: Deseret Power Electric Cooperative Bonanza Power plant, Boiler #1

This page contains the final PSD permit and related documents for the Deseret Power Electric Cooperative Bonanza Power Plant existing Boiler #1, located on the Uintah and Ouray Indian Reservation, in Uintah County, Utah, PSD Permit Number: PSD-UO-0001-2001:00. This permit was issued on February 2, 2001 under the authority of the Prevention of Significant Deterioration Permit Program at 40 CFR Part 52.

You may need Adobe Reader to view files on this page. See EPA’s About PDF page to learn more.