WIFIA Pending Loans
Since Fiscal Year 2017, WIFIA has selected hundreds of projects to be supported by WIFIA loans.
The Pending Loans table below provides basic information about each selected borrower’s WIFIA project. To filter these projects, either use the Search bar at the top right of the table or sort any of the columns using the arrow keys.
Status Descriptions:
Invited – The prospective borrower submitted a letter of interest and was invited to apply.
Applied – The prospective borrower submitted a WIFIA loan application.
Paused – The prospective borrower applied but needs to complete a major milestone that is outside EPA's control, such as securing voter authorization to issue debt.
| Prospective Borrower | Project Name | State | Status | Project Description |
|---|---|---|---|---|
| Los Angeles County Flood Control District | Los Angeles County Flood Control and Water Conservation Projects | California | Applied | The Los Angeles County Flood Control District will improve its stormwater management infrastructure to facilitate sediment removal that will increase capacity for water conservation and address local water quality concerns. |
| North of River Sanitary District | Water Resource Recovery Facility Expansion | California | Invited | The North of River Sanitary District will construct a new water resource recovery facility with all necessary treatment equipment to address capacity challenges related to population growth. |
| San Diego | Stormwater Capital Improvement Program – Loan 2 | California | Applied | The City of San Diego will continue to plan, design, and construct stormwater infrastructure to reduce risk of flood and improve the water quality of stormwater discharged into local water bodies. |
| Pacifica | Sewer Collection System Pipeline Rehabilitation and Replacement Project | California | Applied | This project will increase the reliability of the City of Pacifica’s overall sewer collection system by replacing approximately 8 miles of sewer conveyance pipelines and associated laterals and manholes. |
| Town of Windsor | Water Reclamation Facility Modernization | California | Applied | Windsor is consolidating another nearby wastewater treatment plant. This project will include upgrades to manage increased flow, as well as rehabilitation of aging water infrastructure. |
| Le Grand Athlone | Intertie and Recharge Project | California | Applied | This project includes construction of canal infrastructure that will provide stormwater management and groundwater recharge improvements. |
| Hayward | WPCF Improvements – Phase II Project | California | Applied | The City of Hayward will construct a replacement primary effluent facility and pump station to address nutrient removal. |
| Central Coast – Pismo Beach (Water) | Central Coast Blue | California | Paused | The Central Coast Blue project will prevent seawater intrusion in the Santa Maria Groundwater Basin and develop a drought-resistant water supply through groundwater recharge. |
| Big Bear Valley | Replenish Big Bear | California | Applied | Replenish Big Bear will help protect Big Bear Valley and the Santa Ana Watershed by recovering a local water resource currently discharged outside of the watershed. |
| Daly City | Vista Grande Drainage Basin Improvement Project | California | Applied | Daly City's project will address storm-related flooding in the Vista Grande Drainage Basin while providing the additional benefit of augmenting the water level of Lake Merced. |
| Escondido | Lake Wohlford Dam Replacement Project | California | Applied | The City of Escondido will construct a replacement dam, integral spillway, a new outlet tower, and partially deconstruct the existing dam. |
| Oceanside | Buccaneer Sewer Lift Station and Force Main Project | California | Applied | The City of Oceanside will optimize and enhance the wastewater system by redirecting sewage flows from the aging La Salina Wastewater Treatment Plant to the existing centralized reclamation facility, the San Luis Rey Water Reclamation Facility. |
| Las Virgenes | Pure Water Project (PWP) Las Virgenes-Triunfo | California | Applied | Las Virgenes will construct an advanced water purification facility to treat water for reuse, reducing the need for imported water and supporting compliance with regulatory requirements for discharge to Malibu Creek. |
| Rancho California Water District | Vail Dam Seismic and Hydrologic Remediation Project | California | Paused | The Vail Dam Seismic and Hydrologic Remediation Project will construct a new straight-axis concrete dam located downstream of the existing arch dam. |
| Rialto Water Service LLC | Microgrid and System Improvements | California | Paused | The Microgrid and System Improvements project consists of wastewater and drinking water treatment plant improvements, the creation of retention ponds at the wastewater treatment plant outfall, a detailed analysis of condition assessments, cybersecurity enhancements, the installation of Automatic Meter Infrastructure, and expansion of the existing gravity sewer system. |
| Sites Project Authority | Sites Reservoir Project | California | Applied | The Sites Reservoir project is a water storage project that will capture and store surface water and stormwater flows from the Sacramento River for use in communities, farms, and businesses. |
| South Coast Water District | Doheny Ocean Desalination Project | California | Applied | South Coast Water District will construct a desalination plant to produce up to 5 million gallons per day (MGD) of potable drinking water. |
| Central Coast – Pismo Beach (Wastewater) | Central Coast Blue | California | Paused | The Central Coast Blue project will prevent seawater intrusion in the Santa Maria Groundwater Basin and develop a drought-resistant water supply through groundwater recharge. |
| Tahoe City | Tahoe Cedars Water System Reconstruction Project | California | Paused | Tahoe City will completely replace its existing water distribution infrastructure, including water mains, transmission mains, meters, and fire hydrants. |
| Amador Water Agency | Water System Capital Improvements | California | Applied | Amador Water Agency will complete several projects throughout the service area to improve drinking water quality and meet current and future water demand. |
| Santa Clara Valley Water District | Safe, Clean and Natural Flood Protection Program – Loan 2 | California | Applied | This project includes improvements to reduce flood risk along nine miles of creek, enhance stream habitat, and improve water quality. |
| Pasadena | Water Infrastructure Program | California | Applied | The City of Pasadena will complete several drinking water infrastructure projects, including meter and water main replacement and water treatment plant improvements. |
| Santa Clara Valley Water District | Anderson Dam Seismic Retrofit - Loan 2 | California | Paused | The Santa Clara Valley Water District will retrofit the Anderson Dam to restore water storage capacity, which is currently restricted due to the seismic vulnerability of the dam. |
| Stockton East Water District | Water Treatment Facility and Conveyance Improvement Project | California | Invited | Stockton East Water District will complete several water infrastructure projects to modernize facility infrastructure, establish redundancies, and improve system efficiency. |
| Morgan Hill | Sewer Trunk Line Project | California | Applied | The City of Morgan Hill will construct a new parallel sewer trunk line that connects to an existing treatment plant to address capacity requirements and provide system redundancy. |
| San Jose Water Company | Williams Road Station PFAS Treatment Project | California | Invited | San Jose Water Company will develop a new drinking water treatment facility to address PFAS contamination in the groundwater. |
| Redding | Pump Station 1 Replacement Project | California | Invited | The City of Redding will replace and relocate the existing Pump Station 1 in order to provide a reliable water source to the water treatment plant with capacity to meet the needs of current and future customers. |
| East County Advanced Water Purification Joint Powers Authority | East County Advanced Purification System - Loan 2 | California | Invited | The East County Advanced Water Purification Joint Powers Authority will construct a new advanced water purification facility along with associated pipelines, pump stations, and other facilities to treat the region’s wastewater and produce advanced treated water for surface water augmentation. |
| San Francisco Public Utilities Commission | Wastewater Capital Plan Resilience Projects - Loan 2 | California | Applied | The San Francisco Public Utilities Commission will continue to repair and replace aging wastewater and stormwater infrastructure to enhance system reliability. |
| Pueblo | Secondary Clarifier Replacement | Colorado | Invited | The City of Pueblo will install new secondary clarifiers to replace existing clarifiers that require a groundwater dewatering permit. |
| Northern Water Enterprise | Northern Integrated Supply Project | Colorado | Invited | The Northern Integrated Supply Project is a proposed regional water storage and distribution project that will annually supply 15 Northern Colorado Front Range water providers with approximately 40,000 acre-feet of new, reliable water supplies by building two reservoirs and associated infrastructure. |
| Project 7 Water Authority | Ridgway Water Treatment Plant | Colorado | Paused | The Ridgway Water Treatment Plant project will construct new water treatment plant to serve as a redundant water source for the communities in the Uncompahgre and Gunnison River Valleys. |
| South Central Connecticut Regional Water Authority | Lake Whitney Dam and Spillway Improvements | Connecticut | Invited | The Lake Whitney Dam and Spillway Improvements project will rehabilitate the dam which is used for drinking water supply and drought mitigation. |
| Water Cooperative of Central Florida | Cypress Lake Alternative Water Supply (CLAWS) Water Treatment Plant (WTP) | Florida | Invited | The Water Cooperative of Central Florida will construct a 15 MGD water treatment plant as part of its inland groundwater desalination project, which will help communities supplement their water supply and provide customers with reliable drinking water. |
| Winter Haven | One Water Program | Florida | Invited | The City of Winter Haven's One Water Program will modernize aging water and wastewater facilities to support population growth, comply with future regulatory requirements, and address water supply affordability. |
| Riviera Beach | Water Treatment Plant Project | Florida | Invited | The City of Riviera Beach will construct a new, state-of-the-art water treatment plant to increase water system capacity and meet the growing needs of the population. |
| Melbourne | Water and Sewer System Capacity Increase and Water Quality Improvements | Florida | Invited | The City of Melbourne will complete several projects, including water treatment plant and water reclamation facility improvements, collection system rehabilitation, and system expansion to provide safe and reliable water services to current and future customers. |
| North Miami | NoMi Water Treatment Plant Expansion Project and Water System Upgrades | Florida | Invited | The City of North Miami will design and construct several water infrastructure improvements and also design a new 12 MGD water treatment plant to provide additional water capacity and reliability to customers. |
| Clayton County | Strategic Master Plan Funding 2024 | Georgia | Invited | Clayton County will complete several projects within their Master Plan, including treatment plant expansions, water meter installation, and sewer line replacements. |
| Honolulu Board of Water Supply | Kalaeloa Seawater Desalination Facility Project | Hawaii | Applied | This project will provide safe, dependable, and affordable water to the community, through the development of new water sources, replacement of aging pipelines, construction of a desalination plant, and more. |
| Thorn Creek Basin Sanitary District | Biosolids Improvements | Illinois | Invited | The Thorn Creek Basin Sanitary District will upgrade its wastewater treatment plant’s biosolids treatment system and modernize aging infrastructure. |
| Oswego | Oswego WaterLink | Illinois | Applied | The WaterLink project (including the City of Yorkville, the Village of Montgomery, and the Village of Oswego) will include constructing new publicly owned drinking water infrastructure and replacing the current primary water source. |
| Yorkville | Yorkville WaterLink | Illinois | Applied | The WaterLink project (including the City of Yorkville, the Village of Montgomery, and the Village of Oswego) will include constructing a new publicly owned drinking water infrastructure and replacing the current primary water source. |
| Montgomery | Montgomery WaterLink | Illinois | Applied | The WaterLink project (including the City of Yorkville, the Village of Montgomery, and the Village of Oswego) will include constructing a new publicly owned drinking water infrastructure and replacing the current primary water source. |
| Grand Prairie Water Commission | Alternative Water Source Program | Illinois | Applied | The Alternative Water Source Program will create a long-term source of water supplies by constructing a new, publicly-owned drinking water infrastructure system to meet current and future water supply needs. |
| Roselle | Triangle Area Utility Improvements and Kennedy Sanitary Force Main Improvements | Illinois | Invited | This project will help the Village of Roselle address regulatory compliance, modernize aging infrastructure, reduce water loss, and prevent sanitary sewer overflows through the replacement of water mains, lead service lines, sanitary sewer lines, and force mains. |
| Iowa Finance Authority | Clean Water and Drinking Water Infrastructure Projects | Iowa | Paused | The Iowa Finance Authority will complete a mixture of projects that are eligible for clean water and drinking water state revolving fund financing. |
| Spring Hill | Spring Hill Wastewater Expansion | Kansas | Invited | The City of Spring Hill will expand its sewer system through installation of gravity and force main sewer lines, upgrades to an existing pump station, and the construction of a new pump station and will construct a new wastewater treatment facility. |
| Unified Government of Wyandotte County / Kansas City, Kansas | Kansas City, Kansas Community-Based Partnership - Stormwater Program | Kansas | Paused | The Unified Government of Wyandotte County will integrate stormwater, combined sewer, and other infrastructure projects to address frequent flooding, repair critical infrastructure, and improve water quality. |
| Hays | R9 Wellfield and Pipeline Project | Kansas | Invited | The City of Hays will construct new municipal wells, a raw water storage tank, raw water pump station, raw water transmission pipeline, elevated storage tank, and ancillary project elements necessary to deliver water from the wellfield. |
| National Water | Ascencion Parish Regionalization Project | Louisiana | Applied | The Regionalization Project will support reliable wastewater treatment service and future population growth in Asencion Parish by redirecting sewerage flow from decentralized sewer systems into existing wastewater treatment plants. |
| Shreveport | Infrastructure Rehabilitation Project | Louisiana | Invited | The City of Shreveport will improve and rehabilitate its drinking water and wastewater infrastructure to reduce sanitary sewer overflows, ensure consent decree compliance, and provide safe drinking water to residents. |
| Baltimore City Department of Public Works | Wastewater Rehabilitation Program 2020 | Maryland | Applied | The City of Baltimore's Wastewater Rehabilitation Program 2020 includes 5 projects to rehabilitate parts of the Patapsco Wastewater Treatment plant, the Back River Wastewater Treatment plant, and a high-level interceptor. |
| Baltimore City Department of Public Works | Water Infrastructure Advancement 2021 | Maryland | Paused | The City of Baltimore's Water Infrastructure Advancement 2021 project will decrease the risk of water service interruption, main breaks and flooding, as well as emerging contaminants. |
| South Sioux City | South Sioux City Wastewater Treatment Facility Expansion Project | Nebraska | Applied | The South Sioux City Wastewater Treatment Facility Expansion Project will expand its current wastewater treatment facility's capacity and conveyance system to accept domestic flows and additional industrial flows. |
| Cortland | Homer Avenue Gateway Project | New York | Paused | The City of Courtland's project will completely replace the aging potable water, sanitary sewer, and storm sewer infrastructure along Homer Avenue. |
| Sweet Home | Mahler Water Reclamation Facility Improvements | Oregon | Invited | The City of Sweet Home's project includes a complete renovation of the sole wastewater treatment plant to increase its capacity and reliability of treatment. |
| Port of Morrow | Groundwater Water Quality and Conservation Program | Oregon | Applied | The Groundwater Water Quality and Conservation Program will implement projects to reduce groundwater nitrate concentrations and dependency on groundwater. |
| Chester Water Authority | Susquehanna Raw Water Pumping Station Reliability Improvements | Pennsylvania | Paused | The Susquehanna Raw Water Pumping Station Reliability Improvements Project will maintain the Chester Water Authority's ability to reliably provide quality water to its customers by making improvements to the Susquehanna Raw Water Pumping Station. |
| Chester Sewer District | City of Rock Hill Wastewater Connection | South Carolina | Invited | The Chester Sewer District will construct a force main and pump stations to connect its wastewater system to the nearby City of Rock Hill’s wastewater treatment plant. |
| Memphis | Stiles WWTF Solids Processing Upgrades | Tennessee | Paused | The Stiles Wastewater Treatment Facility Solids Processing Upgrades project will help the City of Memphis meet its near-term and long-term biosolids management goals, including increasing capacity and performance, upgrading aging infrastructure and managing solids disposal. |
| Columbia Power and Water Systems | Long Term Water Supply Program | Tennessee | Applied | The Long Term Water Supply Program includes water supply, treatment, and distribution system projects on the Columbia Power and Water Systems system and its two major wholesale customer's systems, city of Spring Hill and Maury County Water System. |
| Beeville | Beeville Water Supply Resiliency Improvements | Texas | Invited | The City of Beeville will complete various drinking water projects, including rehabilitating existing groundwater wells, constructing new groundwater wells, and planning and design for future alternative water supply. |
| Justin | Water System Improvements | Texas | Invited | The City of Justin will complete drinking water infrastructure projects, including the construction of 8,800 linear feet of transmission mains, a new storage tank, pump station, and storage building to address significant population growth. |
| Denton | 5-Year Water Capital Improvement Program | Texas | Invited | The City of Denton’s Water Capital Improvement Program will include upgrades to the aging water distribution infrastructure, expansion of water supply and storage capacity, wastewater collection system rehabilitation, treatment capacity expansion, and implementation of advanced technologies to improve system reliability. |
| Houston | East Water Plant Enhancement | Texas | Invited | The City of Houston will construct new facilities to expand treatment capacity to the existing East Water Purification Plant by 360 million gallons per day to increase reliability and meet the needs of current and future customers. |
| Austin | Walnut Creek Wastewater Treatment Plant Expansion | Texas | Applied | The City of Austin’s project will increase wastewater treatment plant capacity and upgrade to biological nutrient removal, as well as replace and upsize an existing lift station, rehabilitate headworks, and build a new odor control facility. |
| Blue Brine LLC | Blue Brine Plant Project | Texas | Applied | Blue Brine LLC’s project will address water scarcity and pollution by turning desalination discharge waste into fresh water and mineral byproducts. |
| Liberty Hill | Liberty Hill Water Supply | Texas | Invited | Liberty Hill will construct a direct potable reuse facility, a new wastewater treatment facility, and an elevated storage tank to increase long-term reliability of potable drinking water supply. |
| Abilene | Water System Improvements | Texas | Invited | The City of Abilene will complete several drinking water infrastructure projects, including rehabilitating and expanding water treatment facilities to add PFAS treatment, decommissioning an old water treatment facility, constructing a new raw water transmission line with pumping facilities, and replacing two existing raw water transmission lines. |
| Washington County Water Conservancy District | Regional Reuse Purification System | Utah | Invited | The Washington County Water Conservancy District will develop a regional water reuse purification system that will provide drinking water and non-drinking water. |
| Timpanogos Special Service District | Phase 1 Resource Recovery and Collection System Improvements Program | Utah | Invited | The Timpanogos Special Service District will complete several projects, including expansion of existing wastewater infrastructure, implementation of a recycled water program, and improvements to the collection system. |
| Mountain Regional Water Special Service District | Signal Hill Water Treatment Plant Optimization and Expansion Project | Utah | Applied | This project includes improvements and expansion of the Signal Hill Water Treatment Plant, to enhance water supply and address local water quality objectives. |
| Vancouver | PFAS Mitigation Program | Washington | Invited | The City of Vancouver will complete several projects to address PFAS contamination, including developing new groundwater wells and installing PFAS treatment at several facilities. |