Learn the Issues
-
CSO130 Green Infrastructure Project
The CSO130 project in the Story Avenue/Butchertown area includes tree wells and permeable pavers that infiltrate stormwater to off-load the sewer system.
-
Dry Cleaning Sector Regulatory Update
EPA Region 5 bulletin for the dry cleaning sector listing spot cleaning alternatives to PERC and TCE.
-
Lakeland Tool – Degreasing Success Story - 2015
Under a grant from US EPA, Minnesota Technical Assistance program produced this Degreasing Success Story in 2015.
-
General Information for Transportation and Conformity
Transportation conformity is required by the Clean Air Act section 176(c) (42 U.S.C. 7506(c)) to ensure that federal funding and approval are given to highway and transit projects that are consistent with SIP.
-
State Implementation Plans (SIP): Submissions that EPA has Found Adequate or Inadequate
EPA/OTAQ’s State and Local Transportation Resources are for air quality and transportation government and community leaders. Information on state implementation plans (SIPs) that EPA has found either adequate or inadequate is provided here.
-
Sewer Gas Documents and Maps, Former Amphenol Site, Franklin, Indiana
Sewer Gas documents and maps for the Former Amphenol Site, Franklin, Indiana
-
Groundwater Documents and Maps, Former Amphenol Site, Franklin, Indiana
Groundwater documents and maps for the Former Amphenol Site, Franklin, Indiana
-
2018 On-Site Ambient Air Sampling at Amphenol
In July 2018, EPA asked Amphenol Corporation to sample air quality conditions at its Franklin, Ind. facility (IND 044 587 848) related to VOC emissions from the groundwater recovery/air stripping remedial system.
-
Amphenol Off-Site Vapor Intrusion (VI) Investigation
In August 2018, EPA asked Amphenol Corporation o outline the approach to the overall vapor intrusion (VI) investigation in the off-Site Study Area, to be proposed to EPA in a Work Plan.
-
EPA Amphenol Off-Site VI Investigation Work Plan Request
In August 2018, EPA asked Amphenol Corporation o outline the approach to the overall vapor intrusion (VI) investigation in the off-Site Study Area, to be proposed to EPA in a Work Plan.
-
Off-site Vapor Intrusion Study Area
In August 2018, EPA asked Amphenol Corporation o outline the approach to the overall vapor intrusion (VI) investigation in the off-Site Study Area, to be proposed to EPA in a Work Plan.
-
Formica Corp. Facility Documents
OHD 092 821 883, formica, phenolic/formaldehyde resins, railroad tracks, ohio
-
Amphenol December 3, 2019 Public Meeting
Groundwater fact sheets and posters from December 3 Open House on the Former Amphenol Site, Franklin, Indiana
-
Soil Gas Documents and Maps, Former Amphenol Site, Franklin, Indiana
Soil Gas documents and maps for the Former Amphenol Site, Franklin, Indiana
-
FAQs on Release Reporting Requirements for the Final Rule Designating PFOA & PFOS as Hazardous Substances
Questions and Answers on Release Reporting Requirements for this Final Rule designating PFOA, PFOS, and their salts and structural isomers as Hazardous Substances.
-
Required Contractor Contact Information
A facility that uses a contractor to prepare its RMP must include in the registration section the name, mailing address, and telephone number of the contractor who prepared the RMP (40 CFR §68.160(b)(14)). When a contractor only prepares a portion of an RMP on behalf of a facility, does the…
-
Veolia Sauget 2023 Title V Permit Renewal Application
Veolia owns and operates a hazardous waste treatment, storage, and disposal facility in Sauget, Illinois.
-
Certifying Official Qualifying Criteria
The owner or operator of a stationary source must complete a statement certifying that the risk management plan (RMP) is accurate and complete (40 CFR §68.185), a function performed by the Certifying Official through RMP*eSubmit. Are there criteria for qualifying as a Certifying Official when submitting an RMP in RMP*eSubmit…
-
Five-year Anniversary Due Date and Time
Pursuant to the risk management program regulations in 40 CFR §68.190, the owner or operator of a stationary source shall revise and update the RMP at least once every five years from the date of initial submission. At what time on the 5-year anniversary date is the RMP due? The…
-
Obtaining an RMP ID Number
How can a facility subject to the Risk Management Plan (RMP) requirements obtain its RMP ID number? The owner or operator of a regulated RMP facility that has already submitted an RMP, may obtain the facility's identification number (RMP ID Number) by contacting the RMP Reporting Center (703-227-7650). An RMP-covered…