Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Red Hill
  3. Inspections and Enforcement
  4. 2015 Administrative Order

2015 AOC Investigation and Remediation: Fuel Releases

2015 AOC Details

  • 2015 AOC on Regulations.gov
  • Docket on Regulations.gov
  • Parties to the Agreement
  • Additional Documents
  • Investigation and Remediation
    • Investigation and Remediation of Releases
    • Groundwater Flow Patterns
    • Groundwater Monitoring
  • Tank Infrastructure Improvements
    • Corrosion and Metal Fatigue Practices
    • Tank Upgrade Alternatives
    • Risk and Vulnerability Assessment
    • Tank Inspection, Repair and Maintenance
    • Release Detection

The 2015 Administrative Order on Consent (AOC) requires the Navy to develop a plan addressing the January 2014 fuel release from Tank #5 as well as plans to address any future releases of fuel. The Navy is evaluating and implementing various investigative techniques to determine the extent of contamination in the ground around Red Hill. The Navy will also investigate a number of remediation methods for use in the Red Hill area. The Navy will evaluate methods based on their feasibility of implementation, suitableness for use in fractured basalt geology, and effectiveness in reducing contamination.

The Navy submitted a final scope of work on November 5, 2016 which was conditionally approved by the Regulatory Agencies and subsequently revised again and re-submitted on January 5, 2017 (see: Additional Documents).

The Final Approved Scope of Work requires the Navy to develop a number of interim reports that address the installation of groundwater monitoring wells, the extent of available data that can be used to develop models, identification of data gaps, sampling and analysis procedures, assessing natural attenuation, and the development of conceptual site models and groundwater flow models. To date the Regulatory Agencies have received interim deliverables addressing the installation of groundwater monitoring wells and the analysis of groundwater samples, the collection of data to support the development of the groundwater flow and fate & transport models. Documents submitted to date include the Existing Data Summary and Evaluation Report (March 5, 2017), the Red Hill Data Gap Analysis Report (April 25, 2017), the Conceptual Site Model Development Plan (September 1, 2017), the Attenuation Evaluation Plan (September 1, 2017), an addendum to the Sampling and Analysis Plan (September 1, 2017), the Sentinel Well Network Development Plan (December 11, 2017) and the Risk Based Decision Criteria Development Plan (December 11, 2017). These documents are available for review on the “Additional Documents” page.

EPA and Hawai'i DOH (the Regulatory Agencies) reviewed these documents and on December 20, 2017 provided comments to the Navy on four of the documents: the Conceptual Site Model Development Plan, the Sampling and Analysis Plan Addendum 01, the Attenuation Evaluation Plan, and the Monitoring Well Installation Plan Addendum 02 (available documents: Groundwater Monitoring at Red Hill). The Regulatory Agencies’ comment letter includes comments provided to us from the Honolulu Board of Water Supply. The Regulatory Agencies’ comment letter is available for review below.

Documents

LARGE FILE NOTICE: Some files on this page are very large and may require substantial time to download. Save the file to your device before attempting to open. Free viewers and readers are available to read and print documents posted on our website. If you experience a problem reading a document with assistive technology, please contact us.

  • Investigation and Remediation of Releases Report (redacted) (pdf) (741.28 MB, March 25, 2020)
    Report from the Navy detailing their investigation into the 2014 release of fuel from the Red Hill Facility. The Navy’s investigation an remediation effort is being conducted in support of the Groundwater Protection and Evaluation project at the Red Hill Bulk Fuel Storage Facility, Joint Base Pearl Harbor-Hickam, O‘ahu, Hawai‘i as a part of the Administrative Order on Consent section 6. [EXTREMELY LARGE FILE SIZE]
  • Regulatory Agency Review of Navy Deliverables - December 20, 2017 (pdf) (12.86 MB, 12/20/2017)
    Regulatory Agency Comments on Submitted Deliverables under Red Hill AOC Sections 6 & 7 including: "Conceptual Site Model Development and Update Plan, Investigation and Remediation of Releases and Groundwater Protection and Evaluation" - 9/1/2017; "Sampling and Analysis Plan Addendum No. 1" - 9/1/2017; "Attenuation Evaluation Plan, Investigation and Remediation of Releases and Groundwater Protection and Evaluation" - 9/1/2017; "Monitoring Well Installation Work Plan Addendum 02" - 8/25/2017.
  • Additional Documents

Red Hill

  • About Red Hill
    • About the Fuel Releases
    • Frequently Asked Questions
  • Closure of the Red Hill Bulk Fuel Storage Facility
    • Defueling Plan
    • Closure Plan
  • Drinking Water Quality
  • Environmental Investigation and Remediation
    • Groundwater Results Application
    • 2015 Administrative Order
  • Inspections and Enforcement
    • 2023 Administrative Consent Order
      • Community Representation Initiative
    • 2015 Administrative Order
      • Parties to the Agreement
      • Investigation and Remediation
      • - Fuel Releases
      • - Groundwater Flow Patterns
      • - Groundwater Monitoring
      • Tank Infrastructure Improvements
      • - Corrosion and Metal Fatigue Practices
      • - Release Detection
      • - Risk and Vulnerability Assessment
      • - Tank Inspection, Repair and Maintenance
      • - Tank Upgrade Alternatives
      • Additional Documents
      • Remediation Roundtable
    • Drinking Water Quality
    • Spill Prevention and Underground Storage Inspections
    • Fire Suppressant (“AFFF”) Spill
    • Defueling Plan and Closure
  • Public Engagement
    • Email Distribution List
    • Calendar of Events
    • Webinars
    • Community Representation Initiative (2023 Order)
    • Remediation Roundtable (2015 AOC)
Contact Us About Red Hill
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on August 19, 2024
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.