Inspections and Enforcement
- Background
- Inspections and Investigations
- Enforcement Actions
- Documents, Correspondence, Reports and Data
Background
As a result of the November 2021 fuel release, 2022 Aqueous Film Forming Foam (AFFF) release, and subsequent drinking water complaints, EPA has conducted several inspections and investigations to assess compliance at the Red Hill Bulk Fuel Storage Facility and nearby Joint Base Pearl Harbor-Hickam (JBPHH) Drinking Water System.
Based on the agency’s findings, EPA entered into an Administrative Consent Order in 2023 with the Navy and Defense Logistics Agency (DLA).
Inspections and Investigations
Defueling Completion Inspections
During the week of March 5, 2024, EPA conducted an inspection and evaluation of the Red Hill Bulk Fuel Storage Facility to confirm that the overwhelming majority of fuel had been removed from the facility consistent with assertions made by Joint Task Force-Red Hill and assess operations and environmental compliance at the facility at the time of transition to Navy Closure Task Force.
EPA sent a letter determination on March 21, 2024, to Joint Task Force-Red Hill (JTF-RH) that they had met all eleven exit criteria listed in Defueling Plan Supplement 3. The final Defueling Inspection Report is available below.
In the time between this inspection and the generation of the inspection report, authority over the RHBFSF has been transferred from Joint Task Force-Red Hill (JTF-RH) to Navy Closure Task Force – Red Hill (NCTF-RH).
- Final Report: Red Hill Bulk Fuel Storage Facility Interim Defueling Completion Inspection (pdf)
- EPA Letter to Joint Task Force-Red Hill: Exit Criteria Complete (pdf)
- EPA Letter to Joint Task Force-Red Hill: Interim Defueling Inspection Preliminary RFI (pdf)
Spill Prevention and Underground Storage Inspections
EPA conducted Compliance Evaluation Inspections (CEIs) at the JBPHH from February 28 – March 4, 2022. The purpose of the inspections was to evaluate the United States Department of the Navy’s (the Navy’s) compliance with the Oil Pollution Prevention (OPP) Regulations, including Spill Prevention, Control and Countermeasure (SPCC) requirements under Section 311 of the Clean Water Act, and Hawaii’s approved Underground Storage Tank (UST) regulations pursuant to Subtitle I of the Resource Conservation and Recovery Act (RCRA). Review the findings of these reports at Joint Base Pearl Harbor Hickam Compliance Evaluation Inspections.
Drinking Water System Compliance
EPA has conducted several inspections of the Navy’s JBPHH and the U.S. Army’s Aliamanu Military Reservation (AMR) drinking water system as well as multiple complaint investigations from resident complaints. Review these inspections and investigations at Drinking Water System Compliance at Joint Base Pearl Harbor-Hickam.
AFFF Release Investigation
On November 29, 2022, the EPA was notified of a hazardous material release incident involving the release of Aqueous Film Forming Foam (AFFF) concentrate within the Red Hill Bulk Fuel Storage Facility and in the surrounding environment. EPA conducted an investigation of the release, available here at Fire Suppressant (“AFFF”) Spill.
Enforcement Actions
2023 Administrative Consent Order
On June 2, 2023, EPA finalized and signed the 2023 Administrative Consent Order (Consent Order) with the U.S. Department of the Navy (Navy) and the Defense Logistics Agency (DLA) that requires steps to ensure the safe defueling and closure of the Red Hill Bulk Storage Facility (Facility) at Joint Base Pearl Harbor-Hickam (JBPHH) in Honolulu, Hawaiʻi. Under the Consent Order, the Navy has committed to properly operate and maintain the JBPHH drinking water system to protect the health and safety of its consumers.
2015 Administrative Order on Consent
In response to the January 2014 fuel release from the facility, EPA and Hawai'i Department of Health (DOH) negotiated an enforceable agreement, also known as the 2015 Administrative Order on Consent (AOC), with the U.S. Navy and the Defense Logistics Agency (DLA). The Order required the Navy and DLA to take actions, subject to DOH and EPA approval, to address fuel releases and implement infrastructure improvements to protect human health and the environment.
Documents, Correspondence, Reports, and Data
- EPA Letter to Navy: Red Hill Bulk Fuel Storage Facility Response Plan Redetermination (pdf)
- EPA Letter to Navy: September 2026 Review of the 2023 Red Hill AOC SOW Section 3.2.2 Soil Vapor Monitoring Modification Proposal (pdf)
- EPA Letter: Disapproval of Extension Request #4 for Inspection and Cleaning of Red Hill Tank 685 (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.7 Cross-Connection Control Program (pdf)
- EPA Letter: Approval of Modification Proposal for the 2023 ACO Statement of Work, Section 6.5.7 Cross Connection Control Program (pdf)
- EPA Letter: Conditional Approval of Extension Request #2 for the Submittal of Operator SOPs (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.6.2.1 Valve Exercising Program (pdf)
- EPA Letter: Approval of Navy Extension Request #3 for Inspection and Cleaning of Red Hill Tank 685 (pdf)
- EPA Letter: Response to Navy’s Extension Request #2 for General Deliverables (pdf)
- EPA Letter: Response to Navy’s Extension Request #1 for General Deliverables (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.4 Unidirectional Flushing Plan (pdf)
- EPA Letter to Navy: September 2025 Spill Incidents Obligations under 2023 Administrative Order on Consent (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.5 Maintenance Flushing Program (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.5.2 Development of Maintenance Flushing Program (pdf)
- EPA Letter: Partial Approval of Extension Request #2 for Inspection and Cleaning of Red Hill Tanks 316 and 685 (pdf)
- EPA Letter: Approval of Modification Proposal for the 2023 ACO Statement of Work, Section 6.5.5.2 Development of Maintenance Flushing Program (pdf)
- EPA Letter: Approval of Modification Proposal for the 2023 ACO Statement of Work, Section 6.3.1 Sampling of Finished Water Tanks (pdf)
- EPA Letter: Approval of Modification Proposal #2 for the 2023 ACO Statement of Work Section 6.5.4 Unidirectional Flushing Plan (pdf)
- EPA Letter: Approval of Modification Proposal for the 2023 ACO Statement of Work, Section 6.5.6.2.1 Valve Exercising (pdf)
- EPA Letter: Approval of Extension Request #2 for the Submittal of the Maintenance Flushing Program (pdf)
- EPA Letter: Conditional Approval of Extension Request #6 for the Submittal of the Valve Exercising Program and Response to Modification Proposal (pdf)
- EPA Letter: Approval of Modification Proposal for the 2023 ACO Statement of Work, Section 6.11 Complaint Investigation Procedures (pdf)
- EPA Letter: Disapproval of Extension Request #5 for the Submittal of the Valve Exercising Program (pdf)
- EPA Letter: Approval of Extension Request #2 for the Submittal of the Unidirectional Flushing Plan (pdf)
- EPA Letter: Approval of Modification Proposal #1 for the 2023 ACO Statement of Work, Section 6.5.4 Unidirectional Flushing Plan (pdf)
- EPA Letter: Approval of Extension Request #4 for the Submittal of the Valve Exercising Program (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.2 Asset Management Program (pdf)
- EPA Letter: Approval of Extension Request #3 for the Submittal of the Valve Exercising Program (pdf)
- asdf EPA Letter: Approval of Extension Request #2 for Inspection and Cleaning of Camp Smith Tanks S325, S326, and S327 (pdf)
- EPA Letter: Approval of Extension Request #1 for the Submittal of Operator SOPs (pdf)
- EPA Letter: Approval of Extension Request #2 for the Submittal of the Valve Exercising Program (pdf)
- EPA Letter: Approval of Extension Request #1 for the Submittal of the Unidirectional Flushing Plan and Maintenance Flushing Program (pdf)
- EPA Letter: Approval of Extension Request for the Implementation of the Cross-Connection Control and Backflow Prevention Program (pdf)
- EPA Letter: Approval of Extension Request #1 for the Submittal of the Valve Exercising Program (pdf)
- EPA Letter: Approval of Extension Request #1 for Inspection and Cleaning of Camp Smith Tanks S325, S326, and S327 (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.2 Long Term Monitoring – Closed Inactive Water Distribution Lines (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.9 Chemical Use Storage and Handling (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.1.1 Source Water Protection Plan Phase I (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.5.3 Hydraulic Model (pdf)
- EPA Letter: Approval of Extension Request for the Hydraulic Model Demonstration (pdf)
- EPA Letter: Approval of Extension Request for the Submittal of the Cross-Connection Control and Backflow Prevention Program (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.6 Public Notification (pdf)
- EPA Letter: Close Out of 2023 ACO Statement of Work, Section 6.7.1 Certified Operators (pdf)