Is it safe to restart a drinking water shaft in this area when scientists are still working to understand groundwater flow under Red Hill?
Yes, while questions remain concerning the exact rate and direction of groundwater flow beneath Red Hill, the extensive groundwater monitoring has demonstrated that the petroleum plume remains near the Red Hill Facility and is not migrating. Drinking water treatment systems are designed to reduce all regulated contaminants to concentrations below drinking water MCLs. The performance of drinking water treatment systems is demonstrated through pilot testing and routine compliance monitoring after system start-up. In addition, the Red Hill tanks have been defueled, so there is no longer a risk of a large-scale release into a drinking water shaft like the 2021 incident.
Related Questions
- Why is the ʻAiea-Hālawa GAC-IX filter being proposed for removal after 9 quarters? What standards will be used to determine acceptable PFAS levels?
- Has the Navy’s risk and resiliency assessment (after findings in both 2022 and 2024) been revised and reviewed? Is the assessment available to the public?
- Have water system operator SOPs been developed and submitted/approved in order to protect water system consumers as required by the EPA?
- What scientific facts support the re-opening the Navy ʻAiea Halawa Shaft (NAHS)?
- Why is the Navy continuing to flush drinking water lines?
- When will the Navy complete the 2023 ACO requirement to inspect, maintain, and clean the Join Base Pearl Harbor-Hickam public water system water storage tanks?